Standardizing Solar-Ready Telecom Tower Designs
SOLAR TODO
Solar Energy & Infrastructure Expert Team

Watch the video
Standardized solar‑ready telecom tower designs using 48–120 V DC buses, 1–3 kW PV blocks, and remote monitoring can cut OPEX by 25–45%, reduce diesel runtime by 60–80%, and raise network uptime to >99.95% across large multi‑site portfolios.
Summary
Standardized solar‑ready telecom tower designs using 48–120 V DC bus architecture, 1–3 kW PV, and remote monitoring can cut site OPEX by 25–45%, reduce diesel runtime by 60–80%, and improve network uptime to >99.95% across multi‑site portfolios.
Key Takeaways
- Standardize DC bus at 48–120 V with 1.2–1.5x peak DC load sizing to cut conversion losses by 3–5% and simplify multi‑vendor integration.
- Design PV arrays at 1.0–1.3 kWp per kW of average site load to offset 50–80% diesel consumption and stabilize OPEX over 10–15 years.
- Specify Li‑ion or LFP batteries with 1.5–2.0x average daily load (8–16 hours autonomy) to reduce generator starts by 60–80%.
- Implement remote monitoring with 5–15 minute data granularity to reduce truck rolls by 20–30% and improve MTTR to 97% conversion efficiency to improve overall site energy efficiency by 10–15%.
- Target 3–5 year payback by prioritizing high‑diesel sites (>5,000 L/year) and optimizing hybrid run hours to 3–4 kW)
- Lower current, smaller conductors, reduced I²R losses
- Requires stricter safety and insulation practices
For portfolio standardization, many operators adopt:
-
48 V DC bus for:
- Rural, low‑power sites (typ. 0.5–2 kW average load)
- Off‑grid or poor‑grid small towers
-
96–120 V DC bus for:
- Urban or hub sites (2–8 kW average load)
- Data‑heavy or multi‑tenant towers
Sizing the DC Bus and Power Modules
A practical rule is to size the DC bus and power modules at 1.2–1.5x the peak DC load.
Example:
- Average load: 1.5 kW
- Peak load: 2.0 kW
- DC bus and conversion capacity: 2.4–3.0 kW
This margin accommodates:
- Future tenant addition (additional operators)
- 5G/4G upgrades
- Temperature derating of power electronics
Key components of a standardized DC bus architecture:
-
DC distribution panel with:
- Individual fused/breaker outputs for:
- RAN equipment
- Transmission
- Ancillary loads (lights, security)
- Surge protection devices (DC side)
- Individual fused/breaker outputs for:
-
Hybrid power controller with:
- MPPT solar charge controllers (or hybrid rectifier‑MPPT modules)
- Battery charge/discharge management
- DG (diesel generator) start/stop logic
- Grid interface (if available)
-
DC/DC converters (if needed):
- For legacy 24 V loads
- For higher bus voltages feeding 48 V loads
Integrating Solar PV into the DC Bus
Solar PV is typically integrated at the DC level via MPPT charge controllers or hybrid rectifier modules. The goal is to maximize direct DC coupling to minimize conversion steps.
Design principles:
-
PV array sizing:
- 1.0–1.3 kWp per kW of average DC load where solar resource is 4.5–5.5 kWh/m²/day
- Higher PV‑to‑load ratios (1.5–2.0) for off‑grid or high‑diesel sites
-
PV string configuration:
- Match MPPT operating window (e.g., 250–600 V DC) for central controllers
- Use 2–4 strings for 1–3 kWp systems to balance redundancy and cost
-
Protection and balance of system (BoS):
- DC combiner boxes with string fuses and surge protection
- IEC 61215 and IEC 61730 certified modules for durability and safety [IEC 61215‑1:2021; IEC 61730‑1:2023]
Battery Storage: From Backup to Energy Optimizer
In standardized solar‑ready designs, batteries move beyond simple backup to active energy optimization, reducing DG runtime and smoothing PV variability.
Common chemistries and use cases:
-
VRLA (AGM/GEL):
- Lower CAPEX, 3–5 year life in harsh climates
- Suitable for low‑cycle backup (few cycles/month)
-
Li‑ion / LFP:
- Higher CAPEX, 8–12+ year life, 4,000–6,000 cycles at 70–80% DoD
- Ideal for daily cycling with PV and DG optimization
Sizing guidelines:
- 1.5–2.0x average daily load in kWh
- Target 8–16 hours of autonomy at average load
Example:
- Average load: 1.5 kW
- Daily consumption: 36 kWh
- Battery capacity: 54–72 kWh (nameplate), sized for 70–80% usable capacity
Benefits of standardized battery sizing and chemistry:
- Predictable cycle life and replacement schedules
- Simplified spares and logistics across regions
- More accurate OPEX and TCO modeling
Diesel Generator and Grid Integration
Solar‑ready towers still rely on grid or DG for reliability, especially in low‑irradiance seasons or high‑load sites.
Standardized hybrid logic typically:
- Prioritizes PV, then battery, then grid/DG
- Starts DG when:
- Battery SOC falls below a defined threshold (e.g., 30–40%)
- Load exceeds PV + battery discharge limits for a set duration
KPIs to target in standardized designs:
- DG runtime: 99.95%)
Standard solar‑ready design:
- 96–120 V DC bus to reduce cable losses
- 1.0–1.3 kWp PV per kW load (space permitting)
- Modular battery racks that can scale with tenants
- Advanced monitoring for tenant‑level energy allocation
Outcomes:
- Shared infrastructure with transparent energy cost allocation
- Reduced need for oversized DGs by leveraging PV and storage
Portfolio‑Level OPEX and ROI Analysis
Standardization pays off at portfolio scale. Instead of engineering each site from scratch, operators deploy 3–5 standard archetypes (e.g., rural off‑grid, poor‑grid small, poor‑grid large, urban hub).
Portfolio benefits:
- Engineering time per site reduced by 40–60%
- Faster rollout (months instead of years) for 100–1,000+ sites
- Centralized procurement of standardized components lowers CAPEX by 5–15%
Financial metrics:
- High‑diesel sites (>5,000 L/year) often achieve 3–4 year payback
- Portfolio IRR can exceed 15–20% when fuel prices and carbon costs are considered
Comparison and Selection Guide: Architectures and Monitoring
Comparing DC Bus and Hybrid Architectures
| Architecture Type | DC Bus Voltage | Typical Load Range | Pros | Cons | Best Use Case |
|---|---|---|---|---|---|
| Legacy DG‑Only | 48 V DC loads via rectifier, AC DG | 0.5–3 kW | Simple, familiar | High OPEX, high CO₂, low resilience | Transitional sites only |
| Basic Solar + Battery (DC‑coupled) | 48 V | 0.5–2 kW | Low conversion loss, easy retrofit | Limited scalability, higher currents | Rural off‑grid, small sites |
| Advanced Hybrid (PV + Battery + DG + Grid) | 48 or 96–120 V | 1–8 kW | High efficiency, flexible, scalable | Higher design complexity | Poor‑grid, multi‑tenant |
| AC‑Coupled PV with DC Loads | 48 V DC + AC bus | 2–8 kW | Reuses AC PV inverters | Extra conversions, lower efficiency | Sites with large AC loads |
Selection criteria:
-
Choose 48 V DC bus:
- For legacy sites and small loads
- Where safety and simplicity are top priorities
-
Choose 96–120 V DC bus:
- For higher power and longer cable runs
- Where future tenant growth is expected
Remote Monitoring: Architectures and KPIs
Remote monitoring is critical to unlocking OPEX savings. Without reliable data, operators cannot optimize DG runtime, detect underperforming PV, or plan preventive maintenance.
Core elements of a standardized monitoring stack:
-
Site controller / RTU with:
- Inputs from PV, battery, DG, grid meters, DC bus
- Local data logging (at least 30 days)
- Communications via GSM/3G/4G, NB‑IoT, or satellite for remote sites
-
Central NOC platform with:
- 5–15 minute data granularity
- Alarms for:
- Low battery SOC
- DG failure or excessive runtime
- PV underperformance vs. expected yield (e.g., NREL PVWatts baselines [NREL, 2024])
- DC bus over/under‑voltage
-
Integration with OSS/BSS:
- Ticketing for alarms
- Energy cost allocation per tenant or per site
Key KPIs to track:
- Site uptime: target >99.95% for critical towers
- DG runtime and starts per day
- Fuel consumption per kWh delivered
- PV yield vs. expected (kWh/kWp/day)
- Battery cycle count, depth of discharge, and temperature
OPEX impact of robust monitoring:
- 20–30% reduction in truck rolls via remote diagnostics
- 10–20% improvement in battery life through better SOC management
- Faster detection of PV faults, reducing lost generation
Practical Selection Checklist
When standardizing solar‑ready tower designs, define and document:
- DC bus standard(s): 48 V and/or 96–120 V
- Standard PV block sizes: e.g., 1 kWp, 2 kWp, 3 kWp kits
- Standard battery modules: e.g., 5 kWh or 10 kWh LFP racks
- Approved hybrid controllers and rectifiers with >97% efficiency
- Monitoring hardware and communications protocols (Modbus, SNMP, MQTT)
- Minimum compliance standards:
- IEC 61215 / 61730 for PV modules
- IEEE 1547 for grid interconnection where applicable [IEEE, 2018]
- Relevant national electrical codes and grounding standards
FAQ
Q: Why should telecom operators standardize solar‑ready tower designs instead of engineering each site individually? A: Standardization reduces engineering time, simplifies procurement, and improves reliability across large portfolios. By using 3–5 standard design archetypes, operators can cut per‑site design effort by 40–60% and negotiate better pricing on repeatable BoS and power electronics. It also streamlines training for field technicians and reduces configuration errors that often lead to downtime or underperforming solar assets. Over hundreds of sites, these gains translate into significant OPEX and CAPEX savings.
Q: How does a DC bus architecture improve efficiency compared to traditional AC‑centric designs? A: In traditional designs, power often flows from PV (DC) to inverter (AC), then back to rectifiers (DC) for telecom loads, incurring multiple conversion losses. A unified DC bus allows PV and batteries to feed loads directly through high‑efficiency DC/DC stages, typically achieving system efficiencies 3–5% higher. Over thousands of operating hours per year, this efficiency gain reduces fuel consumption and extends battery life. It also simplifies protection and control because all critical loads share a common DC backbone.
Q: What DC bus voltage should we choose for new solar‑ready towers? A: For low‑power rural sites (0.5–2 kW average load), a 48 V DC bus is usually sufficient and aligns with existing telecom standards. For higher‑power or multi‑tenant sites (2–8 kW), a 96–120 V DC bus reduces current, cable size, and I²R losses, improving efficiency over long cable runs. Many operators adopt a dual‑standard approach: 48 V for small sites and 96–120 V for larger hubs, with clear design rules and component families for each voltage class.
Q: How much solar capacity should be installed per telecom tower to meaningfully cut diesel use? A: A useful rule of thumb is 1.0–1.3 kWp of PV per kW of average site load in areas with 4.5–5.5 kWh/m²/day solar resource. For heavily diesel‑dependent off‑grid sites, ratios of 1.5–2.0 kWp per kW load can reduce generator runtime by 60–80%. Actual sizing should consider roof or ground space, shading, local irradiance, and desired autonomy. Using tools like NREL’s PVWatts helps predict annual yield within about ±5% for more accurate business cases.
Q: What role does battery storage play beyond simple backup power? A: In solar‑ready designs, batteries become active energy buffers that optimize when and how diesel generators or grid power are used. Properly sized storage (1.5–2.0x daily load) allows operators to run generators at optimal load for shorter periods, store excess PV energy, and ride through short‑term load spikes without starting the DG. This strategy reduces fuel consumption, DG wear, and noise, while stabilizing DC bus voltage. With Li‑ion or LFP chemistries, daily cycling is feasible for 8–12 years, supporting long‑term OPEX reduction.
Q: How does remote monitoring translate into tangible OPEX savings at tower sites? A: Remote monitoring reduces the need for on‑site visits by enabling diagnostics and configuration changes from a central NOC. Operators can detect issues like PV underperformance, abnormal DG runtime, or battery degradation before they cause outages, cutting truck rolls by 20–30%. Data‑driven maintenance schedules extend component life and avoid catastrophic failures. Monitoring also supports more accurate fuel reconciliation and theft detection, which can be a major hidden cost in diesel‑reliant networks.
Q: What are the key standards and certifications to consider for solar‑ready telecom towers? A: For PV modules, IEC 61215 (design qualification) and IEC 61730 (safety) are essential to ensure durability and safe operation under harsh conditions. For grid‑connected hybrid systems, IEEE 1547 defines interconnection and interoperability requirements for distributed energy resources. National electrical codes and utility interconnection rules must also be followed. Using components tested to UL or equivalent regional standards for inverters, batteries, and protection devices further reduces technical and regulatory risk.
Q: How do we prioritize which sites to convert to solar‑ready designs first? A: Start with high‑diesel and poor‑grid sites where fuel and maintenance costs are highest—typically those consuming more than 5,000 L of diesel per year or experiencing frequent outages. These sites usually offer the fastest payback, in the 3–4 year range, and the greatest CO₂ reduction per dollar invested. Portfolio analytics using historical fuel, runtime, and fault data can help rank sites by expected ROI. Once high‑impact sites are addressed, standard designs can be rolled out to medium‑impact locations.
Q: What typical OPEX and CO₂ reductions can we expect from standardized solar‑ready designs? A: Well‑designed hybrid systems can cut diesel consumption by 50–80% at targeted sites, translating into 25–45% OPEX savings depending on fuel logistics and local tariffs. CO₂ emissions reductions are proportional to fuel savings, often in the range of several tons of CO₂ per site per year. At portfolio scale, this supports corporate ESG targets and can enhance access to green financing. Savings are maximized when solar, storage, and remote monitoring are deployed together under a standardized architecture.
Q: How do standardized designs handle future load growth, such as 5G or additional tenants? A: Standardized architectures are built with modularity in mind. DC bus capacity, PV arrays, and battery racks are sized with 20–30% headroom or designed to be expanded in defined increments (e.g., 1 kWp PV blocks, 5–10 kWh battery modules). Hybrid controllers typically support multiple MPPT and battery channels, allowing phased upgrades without redesigning the entire system. Documented upgrade paths in the design templates ensure that field teams can scale capacity while maintaining compliance and performance.
Q: Are there risks of over‑standardization when dealing with diverse geographies and climates? A: Over‑standardization can be a risk if local climate, solar resource, or regulatory constraints are ignored. The best practice is to define a global or regional design framework with configurable parameters—such as PV‑to‑load ratios, battery autonomy, and cooling strategies—that can be adjusted within defined ranges. For example, battery temperature management may differ between hot desert and cool highland sites, even if the core DC bus and hybrid controller architecture remain the same. Periodic design reviews ensure templates stay aligned with field realities.
References
- NREL (2024): PVWatts Calculator v8.5.2 methodology and solar resource data for estimating PV system performance across global locations.
- IEC 61215‑1:2021 (2021): Terrestrial photovoltaic (PV) modules – Design qualification and type approval, Part 1: Test requirements.
- IEC 61730‑1:2023 (2023): Photovoltaic (PV) module safety qualification – Part 1: Requirements for construction and testing.
- IEEE 1547‑2018 (2018): Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces.
- IEA (2023): Renewable Energy Market Update 2023 – Analysis of solar PV deployment trends and cost reductions globally.
- IRENA (2023): Renewable Power Generation Costs in 2022 – Global trends in LCOE for solar PV and other renewables.
- ITU‑T L.1300 (2016): Best practices for green data centres and telecommunication installations, including energy efficiency guidelines.
About SOLARTODO
SOLARTODO is a global integrated solution provider specializing in solar power generation systems, energy-storage products, smart street-lighting and solar street-lighting, intelligent security & IoT linkage systems, power transmission towers, telecom communication towers, and smart-agriculture solutions for worldwide B2B customers.
About the Author
SOLAR TODO
Solar Energy & Infrastructure Expert Team
SOLAR TODO is a professional supplier of solar energy, energy storage, smart lighting, smart agriculture, security systems, communication towers, and power tower equipment.
Our technical team has over 15 years of experience in renewable energy and infrastructure, providing high-quality products and solutions to B2B customers worldwide.
Expertise: PV system design, energy storage optimization, smart lighting integration, smart agriculture monitoring, security system integration, communication and power tower supply.
Subscribe to Our Newsletter
Get the latest solar energy news and insights delivered to your inbox.
View All Articles