Center pivot field wiringMain cabinet / Eleven numbered bottom openings and three roof feeders. Select an outlet to open its wiring sheet.SOLARTODO / FIELD WIRING & COMMISSIONINGCenter pivot field wiringMain cabinet / Eleven numbered bottom openings and three roof feeders. Select an outlet to open its wiring sheet. Main cabinet opening map Eleven individually numbered bottom openings and three separate top feeders. Each links to its own wiring plate. MAIN CABINET · REFERENCE FRONT VIEW 11 bottom cable openings / 3 top antenna feed-throughs MAIN RETROFIT CABINET Front view with door open. Find the numbered cable gland before pulling the cable. ACSupply and PEIncoming AC and 24 V distribution. I/OControllerCommands and digital feedback. TBTerminal stripsCommand, isolated return and bus groups. RFGateway and radioCellular, fixed GPS A and the radio link. BOTTOM GLAND ROW · MATCH THE NUMBER ON THE ACTUAL ENCLOSURE M-AR1 4G LTECellular coax M-AR2 GPS AFixed center positioning coax M-AR3 RADIO 2.4GHZCabinet-to-tower radio coax M01 AC supply and PEM01 AC POWER IN 110VAC3 × 1.5 mm² · confirm supply→ M02 Start, stop and statusM02 RUN / STOP4 × 0.75 mm² · control→ M03 Forward and statusM03 FORWARD4 × 0.75 mm² · control→ M04 Reverse and statusM04 REVERSE4 × 0.75 mm² · control→ M05 Panel fault statusM05 PANEL FAULT2 × 0.75 mm² · control→ M06 Local-mode statusM06 LOCAL MODE2 × 0.75 mm² · control→ M07 Main water supplyM07 SPAN SPRAY4 × 0.75 mm² · control→ M08 Single end gunM08 END GUN4 × 0.75 mm² · control→ M09 Optional cable monitorM09 CABLE MONITOR2 × 0.75 mm² · 120 Ω STP→ M10 Reserved speed controlM10 SPEED CONTROL4 × 1.0 mm² · control→ M11 Optional sensor busM11 SENSORS2 × 0.75 mm² · 120 Ω STP→ Match the enclosure number and measure the actual route before cutting the cable. M09 and two-wire M11 use separately sourced 120 Ω shielded twisted pair. Check the sensor power route separately. Reference layout shows functions and identifiers. Confirm actual openings, gland fit and cable rating. Use the approved drilling drawing for dimensions. Cable and label schedule R03, pp. 1–4 / Cabinet assembly drawings, pp. 1–2 / Functional layout for tracingCABLE INDEXEN / 01 OF 80
End-tower cabinet openingsEnd-tower cabinet / Two numbered bottom openings and two roof feeders. Select a route to trace its conductors.CABINET ORIENTATION / END TOWEREnd-tower cabinet openingsEnd-tower cabinet / Two numbered bottom openings and two roof feeders. Select a route to trace its conductors. End-tower cabinet opening map Two individually numbered bottom openings and two top antenna feeds. Separate diagrams show the one-cable and split fault wiring options. END-TOWER CABINET · REFERENCE FRONT VIEW 2 bottom cable openings / 2 top antenna feed-throughs END-TOWER RETROFIT CABINET Identify supply and fault wiring independently. ACSupply and PEIncoming AC and 12 V distribution. RFGPS B and radioEnd position and local radio traffic. I/OTower fault inputsX1–X4 with local input returns. E-BR1 RADIO 2.4GHZTower-to-main radio coax E-BR2 GPS BMoving end-tower positioning coax E01 E02 E01 AC POWER IN 110VAC · 3 × 1.5 mm² E02 TOWER FAULTS · 8 × 0.75 mm² E02 · SINGLE-CABLE INSTALLATIONMark the jacket E02 TOWER FAULTS at both ends.Tower signalsFour pairs · signal and return8 × 0.75 mm²End-tower cabinetLocal relay or approved dry inputPowered sources use the approved isolation relay coil pair.Approved dry contacts use the documented X input and local return route.Open the E02 single-cable wiring sheet →E02 · SEPARATE ISOLATION BOXUse a separate 8 × 0.75 mm² cable on each side where fitted.Tower signalsUp to four powered pairsIsolation boxK1–K4 relaysEnd-tower cabinetX1–X4 and returnsMACHINE SIDE jacket suffix4 × A1/A2 coil pairsCONTROLLER SIDE jacket suffix4 × 11/14 dry pairs through opening 02Open machine-side wiring →Open isolated return wiring → The tower cabinet schedule has two bottom openings. See main-cabinet M09 for the optional cable monitor → Drawn by function. Confirm gasket and cable gland placement on the enclosure and use the approved drilling drawing for dimensions. Cable and label schedule R03, pp. 4–5 / Cabinet assembly drawings, pp. 11–16CABLE INDEXEN / 02 OF 80
Field cables and roof feedersMain cabinet 01–11, end tower 01–02 and the five roof feeders.CONTENTS / CABLE INDEXField cables and roof feedersMain cabinet 01–11, end tower 01–02 and the five roof feeders.M01Main cabinet supply and protective earth09M02Start, stop and returned run status10M03Forward command and feedback11M04Reverse command and feedback12M05Original cabinet fault feedback13M06Local mode and takeover feedback14M07Main sprinkler supply and feedback15M08Single end gun and feedback16M09Cable monitor data pair17M10Reserved standard travel-speed cable18M11Optional agricultural sensor cable19E01End-tower supply and protective earth20E02Four end-tower fault inputs21E02-STower faults · single external cable22E02-MTower faults · machine-side cable23E02-CTower faults · controller-side cable24AR1Cellular gateway antenna feeder25AR2Pivot-center GPS A feeder26AR3Main local-radio antenna feeder27BR1Tower local-radio antenna feeder28BR2End-tower GPS B antenna feeder29Field cablesSeparate-box variantsMain cabinet interiorTower interior & recordsCable index / Select a line to open its pageCABLE INDEXEN / 03 OF 80
Separate-box cable variantsChoose these sheets only where a main feedback relay is in a separate enclosure. Each physical segment has its own page.INDEX-BOX / CABLE INDEXSeparate-box cable variantsChoose these sheets only where a main feedback relay is in a separate enclosure. Each physical segment has its own page.M02-CRun / stop · controller side cable30M02-MRun / stop · machine side cable31M03-CForward · controller side cable32M03-MForward · machine side cable33M04-CReverse · controller side cable34M04-MReverse · machine side cable35M05-CPanel fault · controller side cable36M05-MPanel fault · machine side cable37M06-CLocal mode · controller side cable38M06-MLocal mode · machine side cable39M07-CSpan spray · controller side cable40M07-MSpan spray · machine side cable41M08-CEnd gun · controller side cable42M08-MEnd gun · machine side cable43Field cablesSeparate-box variantsMain cabinet interiorTower interior & recordsCable index / Select a line to open its pageCABLE INDEXEN / 04 OF 80
Inside the main cabinetFollow an internal device lead or terminal group. The optional monitoring enclosure is shown on its own sheets.INDEX-MAIN / CABLE INDEXInside the main cabinetFollow an internal device lead or terminal group. The optional monitoring enclosure is shown on its own sheets.MI01Main cabinet AC feed-through and earth44MI0224 V DC supply distribution45MI03Main controller 24 V branch46MI04ACellular gateway 24 V branch47MI04BMain local radio 24 V branch48MI05Controller to gateway Ethernet49MI06Controller to main radio RS-48550MI07ARun and direction command pigtails51MI07BEnd-gun and span-spray command pigtails52MI08Feedback strip to controller inputs53MI09AFeedback returns to block 154MI09BFeedback returns to block 255MI10ADGND to return block 156MI10BReturn block 1 to return block 257MI11Isolated run and direction feedback58MI12Isolated end-gun and panel fault feedback59MI13Isolated local mode and span-spray feedback60MI14AOption cabinet · isolated measurement pair61MI14BOption cabinet · acquisition module power62Field cablesSeparate-box variantsMain cabinet interiorTower interior & recordsCable index / Select a line to open its pageCABLE INDEXEN / 05 OF 80
Inside the end tower and field recordsFollow the tower low-voltage and communication circuits, then record commissioning and as-built terminals.INDEX-TOWER / CABLE INDEXInside the end tower and field recordsFollow the tower low-voltage and communication circuits, then record commissioning and as-built terminals.EI01End tower AC feed-through and earth63EI0212 V DC supply distribution64EI03ATower local radio 12 V branch65EI03BGPS B receiver 12 V branch66EI03CTower input collector 12 V branch67EI04ACollector input COM positive lead68EI04B0 V feed to the tower return block69EI05ARS-485 · Tower local radio70EI05BRS-485 · GPS B receiver71EI05CRS-485 · Tower input collector72EI06AFault feed-through signal pigtails73EI06BFault feed-through return pigtails74EI07Optional tower isolation contact pigtails75COM-1Commission travel, stop and local control76COM-2Commission water, data and fitted options77RECORDAs-built cable and core record78HANDOVERAcceptance and handover79EVIDENCEWhat the project records establish80Field cablesSeparate-box variantsMain cabinet interiorTower interior & recordsCable index / Select a line to open its pageCABLE INDEXEN / 06 OF 80
Prepare, identify and prove the cableStart with the approved circuit, the jacket ID and the two physical ends.METHOD / USING THE GUIDEPrepare, identify and prove the cableStart with the approved circuit, the jacket ID and the two physical ends.1Isolate both endsA qualified electrician identifies all energy sources, including separate towersupplies and backfeeds. Follow the site isolation procedure and verifyabsence of voltage before touching conductors.2Choose the actual cableRead the core count and conductor area on the jacket. Measure the installedroute. Verify protection, voltage rating, gland fit, bend allowance and outdoorsuitability for the actual duty.3Label the jacket and each coreApply matching jacket and core marks at both ends. A four-core cable needstwo jacket labels and eight core labels. Internal leads marked “(function)”use descriptive names when the project gives no printed core ID.4Read the two sides of the railOn these drawings, the upper connection of a feed-through goes inside thebox and the lower one goes to the field. Both belong to one terminal.Adjacent terminals are separate.5Terminate and ring outWith both ends isolated, disconnect sensitive equipment for the plannedcheck. Prove each core by tag. Follow the fitted terminal’s strip length andtorque, then gently tug each conductor.6Resolve every open endA dashed trace ending in a ring marks a site decision. Identify and recordthe actual terminal, matching return and normal state. Cap each reserved orspare core separately until assigned.Assembly drawings, pp. 1–3, 8, 11–12 / Cable and label schedule R03, pp. 1–5CABLE INDEXEN / 07 OF 80
Identify the feedback interfaceThe main cabinet uses DI and DGND. The end tower uses X inputs and its own local 0 V return.INTERFACES / USING THE GUIDEIdentify the feedback interfaceThe main cabinet uses DI and DGND. The end tower uses X inputs and its own local 0 V return.Powered indication through an isolation relayOriginal indication circuitIsolation relayRetrofit feedback circuitSignal to verifyA111Input via XF or tower XIts matching returnA214DGND or local 0 V returnCOILDRY CONTACTThe coil and its dry contact are electrically separate. Terminal 12 is unused in the reference normally-open arrangement.A compatible dry contact already existsExisting volt-free contactReference input pairContact end 1Assigned input via XF or tower XContact end 2Matched DGND or local 0 V returnCheck the interface before connectionDocument whether the original signal is powered or volt-free, its normal state and the matching return. Choose the approved circuit and use its conductorlabels. Machine voltage stays on the coil side.Main cable schedule R02 / Assembly drawings, pp. 8, 14 and 16 / R03, p. 5CABLE INDEXEN / 08 OF 80
Main cabinet supply and protective earthReference 110 V AC branch to the 24 V DC power supplyM01 / MAIN CABINETMain cabinet supply and protective earthReference 110 V AC branch to the 24 V DC power supplyMAIN RETROFIT CABINETDesign incoming AC branch feeds a 24 V DC supply.ORIGINAL CONTROL CABINETBranch position, protection and terminals to be verified.VERIFY THE SOURCE BEFORE TERMINATINGDesign input is 110 V AC. Verify actual control-supply voltage.LApproved protected line branchNVerified return of that same branchPEDedicated protective-earth conductorRecord the approved locations before landing any lead.24 V DC POWER SUPPLYAC INPUTLNCABINET PE BARX0-LX0-NPELNPEProtectedlineSame branchreturnProtectiveearth pointCABLE JACKET CUTAWAYM01-LM01-LM01-NM01-NM01-PEM01-PEBottom opening 01 · AC entryOriginal branch entry · verifyM01 AC POWER IN 110VACM01 AC POWER IN 110VACReference cable · 3 × 1.5 mm², including green/yellow PESolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Approve the branchIsolate both ends and verify absence of voltage.Check the source and its dedicated protection.Verify L, its paired return and the earth point.2Label and routeUse the shown jacket label for an approved 110 V feed.Mark L, N and PE at each end before landing.Use bottom opening 01 and the matching terminals.3Check before useVerify protective bonding and conductor identity.Record AC input and the 24 V DC output.Reconnect loads only under the approved procedure.BENCH TESTNo cable-specific continuity, protective-earth or voltage measurement is recorded for this main supply lead.FIELD CHECKApproved source, protection, terminal position and protective continuity must be recorded on the actual machine.Main conductor schedule R02 • rows 7–9 | Cable schedule R03 | Assembly pp. 2–4CABLE INDEXEN / 09 OF 80
Start, stop and returned run statusFour cores carry the remote start and stop request and a separate run feedback circuit.M02 / MAIN CABINETStart, stop and returned run statusFour cores carry the remote start and stop request and a separate run feedback circuit. M02 physical cable and reference termination drawing Four cores carry the remote start and stop request and a separate run feedback circuit. The original cabinet endpoints are open until approved. MAIN RETROFIT CABINET Reference assembly terminal locations ORIGINAL CABINET Locate the drawing references and verify the actual circuit. FIELD LANDINGS OPEN CONTROLLER CH1 start and stop request COM NO XC strip XC-1aXC-1b K1 RUN FEEDBACK RELAY MACHINE COIL ISOLATED DRY CONTACT A1 A2 11 14 XF-1XF-1R CONTROLLER DI1 input DGND return M02-K1-11 M02-K1-14 INDEPENDENT RUN STATUS 1MF / 1MR spare auxiliary contacts One approved run state for both directions. ORIGINAL START AND STOP Trace SA3 and ST-1. ST-1 contacts 23–25. Retain the stop chain. Keep the 24 V branch intact. Bottom exit 02 Field entry · confirm on site M02 RUN / STOP · 4 × 0.75 mm² CONTROL CABLE Same jacket ID and same core IDs at both ends M02-K1-A2 M02-K1-A2 RUN RETURN Terminal to confirm M02-K1-A1 M02-K1-A1 RUN SIGNAL Terminal to confirm M02-CH1-NO M02-CH1-NO RUN REQUEST Terminal to confirm M02-CH1-COM M02-CH1-COM RUN COMMON Terminal to confirm Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find opening 02Isolate and prove both cabinets de-energized.Mark the jacket and each core at both ends.Ring out all four cores with the ends isolated.2Trace the original controlsTrace SA3 and ST-1. Retain the original stop chain.Confirm a separate run signal in both directions.Confirm its matching return and relay coil rating.3Prove run and stopUse the signed design and approved test load first.Prove local stop, remote stop and no sudden start.Witness travel and match DI1 to actual standstill.BENCH TEST13 Nov 2026: DI1 closed on forward and reverse starts and opened after a stop on the existing contact-harness fixture.FIELD CHECKConfirm the original hold/release design, independent run source and original stop authority. Never bridge ST-1 contacts 23 and 25.R02 main cable schedule, rows 10–13 and tests 09–11 / R03 opening 02 and dry-contact labels / 13 Nov board benchCABLE INDEXEN / 10 OF 80
Forward command and feedbackOne four-core cable carries the forward request and the separate forward-status circuit. • 4 × 0.75 mm²M03 / MAIN CABINETForward command and feedbackOne four-core cable carries the forward request and the separate forward-status circuit. • 4 × 0.75 mm² M03 forward cable from retrofit cabinet to original irrigation cabinet Four labeled cores follow the U-shaped cable route. The retrofit assembly terminals are documented. The original circuit references are open and require field confirmation. A relay separates the original feedback circuit from the controller input. MAIN RETROFIT CABINET Reference assembly terminal locations ORIGINAL CABINET Locate the drawing references and verify the actual circuit. CONTROLLER CH2 forward request COM NO K2 FORWARD FEEDBACK RELAY MACHINE COIL ISOLATED DRY CONTACT A1 A2 11 14 XC strip XF CONTROLLER DI2 input DGND return HL5 FORWARD INDICATION 3SS SELECTOR REFERENCE Drawing candidates. Verify status and return. wire 23 at TB2-2 · wire 11 at TB1-1 Drawing traces only. Changeover design required. FIELD LANDINGS OPEN Bottom exit 03 Field entry · confirm on site M03 FORWARD · 4 × 0.75 mm² CONTROL CABLE Same jacket ID and same core IDs at both ends XC-2aXC-2b XF-2XF-2R M03-CH2-COM M03-CH2-COM REMOTE COMMON Terminal to confirm M03-CH2-NO M03-CH2-NO REMOTE REQUEST Terminal to confirm M03-K2-A1 M03-K2-A1 TB3-1 wire 1 · HL5 signal M03-K2-A2 M03-K2-A2 TB3-4 wire 4 · same HL5 return M03-K2-11 M03-K2-14 Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify both pairsIsolate both cabinets. Mark the jacket M03 FORWARD.Fit the same core ID at each end. Check continuityend to end with both ends disconnected.2Trace before landingTrace the selector in all positions. Verify the HL5 signal,its matching return and the feedback relay coil rating.Land the four field ends against the signed drawing.3Prove forward travelAfter field approval, test the request and DI2 separately.Witness forward travel. Check reverse feedback stays off.Stop the pivot and confirm that DI2 clears.BENCH TEST13 Nov 2026 · With the bench jumper harness, DI2 closed on forward start and opened after stop.FIELD CHECKConfirm the selector circuit, interlocks and feedback pair before landing the field ends.Main cable schedule R02, rows 14–17 / Forward wiring example R03, pp. 2–3, 5 / Original main cabinet schematicCABLE INDEXEN / 11 OF 80
Reverse command and feedbackThe reverse request and the independently returned reverse status use separate pairs in the same cable.M04 / MAIN CABINETReverse command and feedbackThe reverse request and the independently returned reverse status use separate pairs in the same cable. M04 physical cable and reference termination drawing The reverse request and the independently returned reverse status use separate pairs in the same cable. The original cabinet endpoints are open until approved. MAIN RETROFIT CABINET Reference assembly terminal locations ORIGINAL CABINET Locate the drawing references and verify the actual circuit. FIELD LANDINGS OPEN CONTROLLER CH3 reverse request COM NO XC strip XC-3aXC-3b K3 REVERSE FEEDBACK RELAY MACHINE COIL ISOLATED DRY CONTACT A1 A2 11 14 XF-3XF-3R CONTROLLER DI3 input DGND return M04-K3-11 M04-K3-14 HL4 REVERSE INDICATION 1MR auxiliary contact feeds HL4 on the drawing Verify the status and its matching circuit return. 3SS SELECTOR REFERENCE wire 23 at TB2-2 · wire 12 at TB1-2 Drawing traces only. Changeover design required. Bottom exit 04 Field entry · confirm on site M04 REVERSE · 4 × 0.75 mm² CONTROL CABLE Same jacket ID and same core IDs at both ends M04-K3-A2 M04-K3-A2 TB3-4 wire 4 · same HL4 return M04-K3-A1 M04-K3-A1 TB3-2 wire 2 · HL4 signal M04-CH3-NO M04-CH3-NO REMOTE REVERSE Terminal to confirm M04-CH3-COM M04-CH3-COM REMOTE COMMON Terminal to confirm Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find opening 04Isolate and prove both cabinets de-energized.Match the jacket and core labels at both ends.Use an isolated test to verify each core.2Trace the two circuitsRecord the actual 3SS switch positions and paths.Verify both HL4 wires and the relay coil rating.Use the signed reverse and interlock drawing.3Prove reverse and stopAt standstill, test the request and DI3 separately.Witness reverse travel and check DI2 stays off.Stop and verify DI3 drops and travel ceases.BENCH TEST13 Nov 2026: DI3 closed on reverse start and opened at stop in the existing contact-harness test.FIELD CHECKVerify the original selector circuit, interlock, HL4 source and return before landing. Observe actual machine movement and stop.R02 main cable schedule, rows 18–21 and tests 08–10 / R03 opening 04 and dry-contact labels / 13 Nov board benchCABLE INDEXEN / 12 OF 80
Original cabinet fault feedbackTwo cores bring an approved original-panel fault indication to the isolated controller input.M05 / MAIN CABINETOriginal cabinet fault feedbackTwo cores bring an approved original-panel fault indication to the isolated controller input. M05 physical cable and reference termination drawing Two cores bring an approved original-panel fault indication to the isolated controller input. The original cabinet endpoints are open until approved. MAIN RETROFIT CABINET Reference assembly terminal locations ORIGINAL CABINET Locate the drawing references and verify the actual circuit. FIELD LANDINGS OPEN INPUT-ONLY CABLE One field signal and return No controller output on this cable. The relay contact supplies status to DI5 in the retrofit cabinet. K5 FAULT FEEDBACK RELAY MACHINE COIL ISOLATED DRY CONTACT A1 A2 11 14 XF-5XF-5R CONTROLLER DI5 input DGND return M05-K5-11 M05-K5-14 CHOOSE AN INDEPENDENT FAULT SOURCE Trace the alarm output and its matching return. HL6 indicates the safety circuit. Choose a separate fault source. Bottom exit 05 Field entry · confirm on site M05 PANEL FAULT · 2 × 0.75 mm² CONTROL CABLE Same jacket ID and same core IDs at both ends M05-K5-A2 M05-K5-A2 FAULT SIGNAL RETURN Terminal to confirm M05-K5-A1 M05-K5-A1 PANEL FAULT SIGNAL Terminal to confirm Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find opening 05Isolate both cabinets. Identify the two cores.Fit the same core labels at both cable ends.Check the cable with both ends disconnected.2Identify the indicationConfirm how healthy, fault and power loss read.Verify the matching return and coil rating.Land only on the approved isolation circuit.3Prove the fault and resetUse the approved test point to simulate a fault.Check the DI5 change and the returned App state.Reset, check recovery and record what DI5 covers.BENCH TESTR02 specifies an isolated relay test. No DI5 fault-loop result is recorded in the 13 Nov board test.FIELD CHECKKeep the original safety chain in service. Keep DI5 unassigned until an independent fault source is approved and verified.R02 main cable schedule, rows 22–23 and tests 03 and 16 / R03 opening 05 and dry-contact labelsCABLE INDEXEN / 13 OF 80
Local mode and takeover feedbackTwo cores bring the independent local-mode indication to DI6 where a suitable source is fitted.M06 / MAIN CABINETLocal mode and takeover feedbackTwo cores bring the independent local-mode indication to DI6 where a suitable source is fitted. M06 physical cable and reference termination drawing Two cores bring the independent local-mode indication to DI6 where a suitable source is fitted. The original cabinet endpoints are open until approved. MAIN RETROFIT CABINET Reference assembly terminal locations ORIGINAL CABINET Locate the drawing references and verify the actual circuit. FIELD LANDINGS OPEN INPUT-ONLY CABLE One field signal and return No controller output on this cable. The relay contact supplies status to DI6 in the retrofit cabinet. K6 MODE FEEDBACK RELAY MACHINE COIL ISOLATED DRY CONTACT A1 A2 11 14 XF-6XF-6R CONTROLLER DI6 input DGND return M06-K6-11 M06-K6-14 CHOOSE AN INDEPENDENT MODE SOURCE Use a verified auxiliary contact if a local/remote selector is fitted. Direction selection and cabinet power are not mode indications. Bottom exit 06 Field entry · confirm on site M06 LOCAL MODE · 2 × 0.75 mm² CONTROL CABLE Same jacket ID and same core IDs at both ends M06-K6-A2 M06-K6-A2 MODE SIGNAL RETURN Terminal to confirm M06-K6-A1 M06-K6-A1 LOCAL MODE SIGNAL Terminal to confirm Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find opening 06Isolate and prove both cabinets de-energized.Label the jacket and two cores at both ends.Ring out the isolated cores and mark any reserve.2Confirm the selector routeRecord the actual behavior in every mode.Find the separate indication and its own return.Land the mode pair only after approval.3Prove local authorityProve the original local stop and takeover.Where fitted, match DI6 to the actual selector.Check mode changes do not start travel.BENCH TESTR02 specifies a mode indication test. No DI6 installed-selector result is recorded in the 13 Nov board test.FIELD CHECKVerify original local stop and takeover before remote movement. Keep DI6 unassigned unless fitted and approved.R02 main cable schedule, rows 24–25 and tests 10 and 16 / R03 opening 06 and dry-contact labelsCABLE INDEXEN / 14 OF 80
Main sprinkler supply and feedbackThe supply permit and an independent pump, valve or flow indication use separate pairs.M07 / MAIN CABINETMain sprinkler supply and feedbackThe supply permit and an independent pump, valve or flow indication use separate pairs. M07 physical cable and reference termination drawing The supply permit and an independent pump, valve or flow indication use separate pairs. The original cabinet endpoints are open until approved. MAIN RETROFIT CABINET Reference assembly terminal locations ORIGINAL CABINET Locate the drawing references and verify the actual circuit. FIELD LANDINGS OPEN CONTROLLER CH5 main supply request COM NO XC strip XC-5aXC-5b K7 SUPPLY FEEDBACK RELAY MACHINE COIL ISOLATED DRY CONTACT A1 A2 11 14 XF-7XF-7R CONTROLLER DI7 input DGND return M07-K7-11 M07-K7-14 INDEPENDENT WATER STATUS Choose approved valve, pump or flow status. Record which state the input actually measures. MAIN WATER SUPPLY PERMIT Confirm the chosen pump or main-valve input. The original drawing has no designated span valve. Bottom exit 07 Field entry · confirm on site M07 SPAN SPRAY · 4 × 0.75 mm² CONTROL CABLE Same jacket ID and same core IDs at both ends M07-K7-A2 M07-K7-A2 WATER RETURN Terminal to confirm M07-K7-A1 M07-K7-A1 WATER STATUS Terminal to confirm M07-CH5-NO M07-CH5-NO PERMIT INPUT Terminal to confirm M07-CH5-COM M07-CH5-COM PERMIT COMMON Terminal to confirm Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find opening 07Isolate all related circuits and label both ends.Ring out the two command and two status cores.Keep any unassigned cores insulated separately.2Identify permit and statusApprove the supply permit and separate status.Record whether status means valve, pump or flow.Use the signed drawing before landing the cores.3Prove flow separatelyTest CH5 and DI7 separately with an approved load.Witness actual flow when water is allowed to run.Record the request, return and water result.BENCH TESTThe board output CH5 closed with DI7 open and timed out on the contact bench. No pump, valve or water was connected.FIELD CHECKKeep these cores isolated until the supply permit and independent feedback are approved. Remove any temporary bench feedback jumper.R02 main cable schedule, rows 26–29 / R03 opening 07 and dry-contact labels / Board supply-feedback timeout recordCABLE INDEXEN / 15 OF 80
Single end gun and feedbackThe original switch can be traced. Remote changeover and separate valve or booster-pump status require approval.M08 / MAIN CABINETSingle end gun and feedbackThe original switch can be traced. Remote changeover and separate valve or booster-pump status require approval. M08 physical cable and reference termination drawing The original switch can be traced. Remote changeover and separate valve or booster-pump status require approval. The original cabinet endpoints are open until approved. MAIN RETROFIT CABINET Reference assembly terminal locations ORIGINAL CABINET Locate the drawing references and verify the actual circuit. FIELD LANDINGS OPEN CONTROLLER CH4 end-gun request COM NO XC strip XC-4aXC-4b K4 END GUN FEEDBACK RELAY MACHINE COIL ISOLATED DRY CONTACT A1 A2 11 14 XF-4XF-4R CONTROLLER DI4 input DGND return M08-K4-11 M08-K4-14 INDEPENDENT END-GUN STATUS Choose valve or booster-pump status. The original switch output is a command signal. ORIGINAL END-GUN SWITCH wire 25 upstream · wire 5 at TB3-6 downstream Trace only. Use the approved changeover design. Bottom exit 08 Field entry · confirm on site M08 END GUN · 4 × 0.75 mm² CONTROL CABLE Same jacket ID and same core IDs at both ends M08-K4-A2 M08-K4-A2 GUN RETURN Terminal to confirm M08-K4-A1 M08-K4-A1 GUN STATUS Terminal to confirm M08-CH4-NO M08-CH4-NO GUN REQUEST Terminal to confirm M08-CH4-COM M08-CH4-COM GUN COMMON Terminal to confirm Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find opening 08Isolate both cabinets. Label the four cores.Trace wires 25 and 5 at the original gun switch.Check continuity on the isolated cable.2Approve the two routesUse the signed break-before-make changeover.Verify the independent status and its return.Keep the original stop protection in service.3Prove remote shutoffIn remote mode, test off with the local switch on.Check that DI4 follows the approved status source.Record valve, pump and actual spray separately.BENCH TEST13 Nov 2026: DI4 followed CH4 on and off on the contact-harness fixture. No spray was tested.FIELD CHECKConfirm original switch routing and independent status. In remote mode, prove the end gun shuts off while the local switch is on.R02 main cable schedule, rows 30–33 and tests 12–13 / R03 opening 08 and dry-contact labels / 13 Nov board benchCABLE INDEXEN / 16 OF 80
Cable monitor data pairOptional RS-485 interface through main cabinet opening 09M09 / MAIN CABINETCable monitor data pairOptional RS-485 interface through main cabinet opening 09MAIN RETROFIT CABINETRS-485 branch point at the controller.CABLE MONITOR ENCLOSUREConfirm the fitted connector, data settings and power.MAIN CONTROLLER · RS-485MONITOR DATA PORTFitted device pin assignment to be verified.A+A+ branch pointAB−B− branch pointBMatch printed A and B.SEPARATE DETECTION CIRCUITOriginal power conductors shown schematically.Use a separately approved detection and power drawing.M09 carries reader data only. Detection topology is site-specific.CABLE JACKET CUTAWAYM09-485-AM09-485-AM09-485-BM09-485-BBottom opening 09 · data cableRemote interface entry · verifyM09 CABLE MONITORM09 CABLE MONITORTwo-wire reference · 120 Ω shielded twisted pair · 2 × 0.75 mm²Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify data pointsFind the controller’s 485 A+ and B− branch.Confirm monitor A/B pinout and serial settings.Approve monitor supply and shield arrangement.2Tag both endsPrint the M09 jacket label at both cable ends.Label A and B individually before termination.Keep the data pair clear of power wiring.3Verify separatelyCheck identity and continuity of the data pair.Use the separate approved detection drawing.Test alarm delivery, mains loss and reconnection.BENCH TESTSoftware simulation covered power loss, monitor faults and reconnection. The physical detection circuit still needs testing.FIELD CHECKApprove the separate monitored-cable detection circuit, power and backup. M09 is the data path only.Main conductor schedule R02 • opening 9 | Cable schedule R03 | Assembly pp. 9–10 and 17CABLE INDEXEN / 17 OF 80
Reserved standard travel-speed cableFour-core cable to hold until speed switching is approvedM10 / MAIN CABINETReserved standard travel-speed cableFour-core cable to hold until speed switching is approvedMAIN RETROFIT CABINETSpeed relay and output channel are unassigned.ORIGINAL CONTROL CABINETApprove the local and remote changeover before using M10.ORIGINAL TIMER TRACE REFERENCESFind and verify the original 1TR timer and its wiring.1Wire 262Wire 253Wire 34Wire 4Switching pair: 2 and 3. Wire 3 goes to TB3-3 in the drawing.Supply pair: 1 and 4. This inset identifies the original circuit.RESERVED SPEED OUTPUTPhysical relay and switching contacts pending.SELECTED PATH · TO BE DESIGNEDOriginal local timer retention required.COMTBCNOTBCCABLE JACKET CUTAWAYM10-SPD-COMM10-SPD-COMM10-SPD-NOM10-SPD-NOM10-SPARE3M10-SPARE3M10-SPARE4M10-SPARE4Bottom opening 10 · reservedApproved selector entry · pendingM10 SPEED CONTROLM10 SPEED CONTROL4 × 1.0 mm² four-core control cable · both ends isolated until approvedSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace original timerLocate 1TR switching terminals 2 and 3.Verify wires 25 and 3, including TB3-3.Check supply pair 1/4 independently.2Prepare the cableMark M10 SPEED CONTROL at both cable ends.Apply COM, NO and applicable spare labels.Insulate each unassigned end individually.3Release and testApprove relay channel and local/remote circuit.Prove switching on an approved test load.Record run-window timing and physical travel.BENCH TESTSoftware timing at 25%, 50% and 100% plus stop was tested. The record covers no physical speed relay or machine travel.FIELD CHECKKeep all reserved cores isolated until a physical channel and the local/remote switching design are approved.Main conductor schedule R02 • opening 10 | Cable schedule R03 | Standard travel-speed simulationCABLE INDEXEN / 18 OF 80
Optional agricultural sensor cableTwo-wire data pair or device-specific approved four-core cableM11 / MAIN CABINETOptional agricultural sensor cableTwo-wire data pair or device-specific approved four-core cableMAIN RETROFIT CABINETRS-485 branch point at the controller.PROBE OR APPROVED ADAPTERConfirm the fitted connector, data settings and power.MAIN CONTROLLER · RS-485DEVICE DATA PORTFitted device pin assignment to be verified.A+A+ branch pointAB−B− branch pointBMatch printed A and B.OPTIONAL FOUR-CORE BUILDSelect only for a compatible device and approved cable.M11-485-AM11-485-AM11-485-BM11-485-BM11-SPARE3M11-SPARE3M11-SPARE4M11-SPARE4Cap unused cores 3 and 4 individually at both ends.If extra cores supply power, verify pinout and amend the approved labels.CABLE JACKET CUTAWAYM11-485-AM11-485-AM11-485-BM11-485-BBottom opening 11 · data cableRemote interface entry · verifyM11 SENSORSM11 SENSORSTwo-wire reference · 120 Ω shielded twisted pair · 2 × 0.75 mm²Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify the probeConfirm A/B pinout, profile and sensor voltage.Verify a suitable adapter for analog readings.Approve the device supply separately.2Choose the cableUse the approved two-wire pair if power is separate.Use a compatible four-core cable when specified.Cap and mark only genuinely unused spare cores.3Validate the sampleCheck continuity and branch communication.Confirm address and reading profile with Admin.Compare the fresh sample to a known reference.BENCH TESTSerial simulator only. Read profiles and software processing were exercised. The fitted sensor and wiring still need testing.FIELD CHECKApprove each probe or adapter pinout, power and profile, then verify a fresh reading and its units after reconnecting.Main conductor schedule R02 • opening 11 | Cable schedule R03 | Sensor serial simulationCABLE INDEXEN / 19 OF 80
End-tower supply and protective earthReference 110 V AC branch to the tower 12 V DC power supplyE01 / END TOWEREnd-tower supply and protective earthReference 110 V AC branch to the tower 12 V DC power supplyEND-TOWER RETROFIT CABINETDesign incoming AC branch feeds a 12 V DC supply.ORIGINAL TOWER SUPPLYBranch position, protection and terminals to be verified.VERIFY THE SOURCE BEFORE TERMINATINGDesign input is 110 V AC. Verify actual control-supply voltage.LApproved protected line branchNVerified return of that same branchPEDedicated protective-earth conductorRecord the approved locations before landing any lead.12 V DC POWER SUPPLYAC INPUTLNCABINET PE BARLNPELNPEProtectedlineSame branchreturnProtectiveearth pointCABLE JACKET CUTAWAYE01-LE01-LE01-NE01-NE01-PEE01-PEBottom opening 01 · AC entryOriginal branch entry · verifyE01 AC POWER IN 110VACE01 AC POWER IN 110VACReference cable · 3 × 1.5 mm², including green/yellow PESolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Approve tower supplyIdentify and isolate the approved source.Confirm voltage, branch protection and return.Verify the original tower protective earth point.2Tag, route and bondMark E01 jacket and each core on both ends.Use tower bottom opening 01 for AC entry.Separate the AC group from the fault input group.3Check before useVerify protective continuity and source pairing.Record the 12 V DC supply before loading.Check voltage again with approved loads fitted.BENCH TESTNo cable-specific continuity, protective-earth or voltage measurement is recorded for this tower supply lead.FIELD CHECKRecord the actual tower supply and branch protection, protective bond and measured DC output before connecting the loads.Cable schedule R03 • E01 | Cabinet assembly pp. 11–14CABLE INDEXEN / 20 OF 80
Four end-tower fault inputsThe separate isolation box uses two eight-core cables. Trace one relay and its matching pair at a time. • 8 × 0.75 mm² per cableE02 / END TOWERFour end-tower fault inputsThe separate isolation box uses two eight-core cables. Trace one relay and its matching pair at a time. • 8 × 0.75 mm² per cableEND-TOWER CABINETDoor open · viewed from the front12 V DCPower supply+V−VTOWER INPUT COLLECTORLower screw strip · actual left-to-right sequenceX4X3X2X1COMA/HB/L+−+12 V distribution123450 V distribution123450 V lead 5 → 1+12 V 5 → COMLOCAL 0 V CONTACT-RETURN BLOCK12345FAULT FEED-THROUGHSTRIPUpper side · inside cabinetLower side · field cableLNPEX1PAIR 1E02-K1-110 VE02-K1-14X2PAIR 2E02-K2-110 VE02-K2-14X3PAIR 3E02-K3-110 VE02-K3-14X4PAIR 4E02-K4-110 VE02-K4-14AC groupTrace by wire ID.Colors are illustrative.BOTTOM OPENING 02E02 cable glandOPTIONAL ISOLATION BOXDry contactsSite-side coilsORIGINAL TOWER FAULT SITESSource locations schematic · actual positions pendingTrace each source and return on site.K1ISOLATEDA2A1E02-K1-11E02-K1-A1E02-K1-14E02-K1-A2VERIFYK2ISOLATEDA2A1E02-K2-11E02-K2-A1E02-K2-14E02-K2-A2VERIFYK3ISOLATEDA2A1E02-K3-11E02-K3-A1E02-K3-14E02-K3-A2VERIFYK4ISOLATEDA2A1E02-K4-11E02-K4-A1E02-K4-14E02-K4-A2VERIFYSites may be distributed across the machine.E02 TOWER FAULTS CONTROLLER SIDEE02 TOWER FAULTS MACHINE SIDEX1–X4 use isolated contacts only. Wire 11 to X and 14 to its 0 V return.A1 is the assigned fault signal. A2 is its matched return.One eight-core cable per side. Confirm the actual openings and routes on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify the fault sourceIsolate the circuits. Assign each physical tower to X1–X4.Trace its signal and matching return. Record both ends.Continuity-check each tagged core before landing it.2Wire one relay at a timeLand the approved signal at A1 and its return at A2.On the dry side, take 11 to X and 14 to its 0 V return.Only the isolated contact feeds the input pair.3Prove alarm and resetAfter approval, test each assigned tower separately.Match its alarm and reset to the tower shown in the App.Verify that the other three inputs keep their prior state.BENCH TEST12 Nov 2026 · X1 read active when connected to local 0 V and cleared when released on the bench.FIELD CHECKConfirm all four tower assignments, source terminals and end-to-end alarm returns.Cable label schedule R03, E02 / Cabinet assembly drawings, pp. 12, 14–16 / Isolated input test record, 12 Nov 2026CABLE INDEXEN / 21 OF 80
Tower faults · single external cableCabinet-mounted isolation relays · powered signals to A1/A2E02-S / END TOWERTower faults · single external cableCabinet-mounted isolation relays · powered signals to A1/A2ORIGINAL TOWER FAULT LOCATIONSSource locations schematic. Trace each actual signal and return.END-TOWER RETROFIT CABINETIsolation relays are mounted inside the tower input cabinet.K1A1A2K2A1A2K3A1A2K4A1A2CABINET-MOUNTED ISOLATION RELAY COILSIsolated contacts connect separately inside this cabinet.CONFIRM ORIGINAL FAULT SIGNALSA single cable carries all four powered pairs to the tower cabinet.A1Assigned tower fault signalA2Matched return of that same circuitFault sources may be distributed across the machine.K1–K4 are relay IDs. Assign actual tower IDs on site.K1 routeSRK2 routeSRK3 routeSRK4 routeSRS = possible source · R = its matched returnCABLE JACKET CUTAWAYE02-K1-A1E02-K1-A1E02-K1-A2E02-K1-A2E02-K2-A1E02-K2-A1E02-K2-A2E02-K2-A2E02-K3-A1E02-K3-A1E02-K3-A2E02-K3-A2E02-K4-A1E02-K4-A1E02-K4-A2E02-K4-A2Original locations · entry plan pendingBottom opening 02 · into end-tower cabinetE02 TOWER FAULTSE02 TOWER FAULTSSingle cable · 8 × 0.75 mm² eight-core control cableSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify each towerMark actual tower IDs for the four relay routes.Verify each powered signal and its matched return.Approve the circuit voltage and relay coil ratings.2Label and routePrint E02 TOWER FAULTS at both cable ends.Tag all eight A1/A2 cores at both ends.Enter through bottom opening 02 and land at coils.3Verify both sidesCheck each relay response and return separately.Check the cabinet’s isolated contacts to X1–X4.Verify reset and the actual tower shown in the App.BENCH TESTThe isolated input module was tested on X1. The eight-core field lead and four fitted relay coils await their own tests.FIELD CHECKRecord the physical source and return for each tower and verify each X channel using the approved isolated contact path.Cable schedule R03 • pp. 4–5 | Cabinet assembly pp. 12, 14–16CABLE INDEXEN / 22 OF 80
Tower faults · machine-side cableSeparate isolation enclosure option · powered source to relay coilsE02-M / END TOWERTower faults · machine-side cableSeparate isolation enclosure option · powered source to relay coilsORIGINAL TOWER FAULT LOCATIONSSource locations schematic. Trace each actual signal and return.SEPARATE ISOLATION ENCLOSURECoil-side A1/A2 terminals only.K1A1A2K2A1A2K3A1A2K4A1A2OTHER SIDE OF EACH RELAY STAYS ELECTRICALLY SEPARATECONFIRM ORIGINAL FAULT SIGNALSAll eight cores belong to the powered machine-side cable.A1Assigned tower fault signalA2Matched return of that same circuitFault sources may be distributed across the machine.K1–K4 are relay IDs. Assign actual tower IDs on site.K1 routeSRK2 routeSRK3 routeSRK4 routeSRS = possible source · R = its matched returnCABLE JACKET CUTAWAYE02-K1-A1E02-K1-A1E02-K1-A2E02-K1-A2E02-K2-A1E02-K2-A1E02-K2-A2E02-K2-A2E02-K3-A1E02-K3-A1E02-K3-A2E02-K3-A2E02-K4-A1E02-K4-A1E02-K4-A2E02-K4-A2Original locations · entry plan pendingOne eight-core cable · isolation box entryE02 TOWER FAULTS MACHINE SIDEE02 TOWER FAULTS MACHINE SIDEReference segment · 8 × 0.75 mm² eight-core control cableSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify each towerRecord actual tower IDs against the four routes.Identify each powered signal and matched return.Approve protection, voltage and coil ratings.2Label both endsUse E02 TOWER FAULTS MACHINE SIDE on jackets.Put each matching A1/A2 label at both ends.Keep this cable separate from the dry-contact lead.3Test the assigned pathsVerify source and return for each isolated route.Prove the intended relay responds and resets.Record the actual sources in the as-built drawing.BENCH TESTNo end-to-end test of this machine-side eight-core cable or its four original fault circuits is recorded.FIELD CHECKS/R locations are shown schematically. Identify the actual tower, source and same-circuit return before connecting.Cable schedule R03 • pp. 4–5 | Cabinet assembly pp. 14–16CABLE INDEXEN / 23 OF 80
Tower faults · controller-side cableSeparate isolation enclosure option · dry contacts to fault terminalsE02-C / END TOWERTower faults · controller-side cableSeparate isolation enclosure option · dry contacts to fault terminalsEND-TOWER RETROFIT CABINETLower fault terminals lead to X1–X4 and local 0 V.SEPARATE ISOLATION ENCLOSUREIsolated dry contacts 11/14 only.K11114K21114K31114K41114OTHER SIDE OF EACH RELAY STAYS ELECTRICALLY SEPARATEDRY CONTACTS TO TOWER INPUTSKeep the input/return pairs separate across the cable.11Goes to the matching X input14Goes to that pair’s local 0 V returnCollector COM is connected to the cabinet’s local +12 V.0 V distribution 5 feeds return block 1. See sheet EI04B.Prove each input against its assigned physical tower.INPUT COLLECTOR LOWER STRIPX4X3X2X1COMA/HB/L+−+12 VLOCAL 0 V RETURN12345X10 VX20 VX30 VX40 VCABLE JACKET CUTAWAYE02-K1-11E02-K1-11E02-K1-14E02-K1-14E02-K2-11E02-K2-11E02-K2-14E02-K2-14E02-K3-11E02-K3-11E02-K3-14E02-K3-14E02-K4-11E02-K4-11E02-K4-14E02-K4-14Bottom opening 02 · fault cableOne eight-core cable · isolation box entryE02 TOWER FAULTS CONTROLLER SIDEE02 TOWER FAULTS CONTROLLER SIDEReference segment · 8 × 0.75 mm² eight-core control cableSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify the dry sideFind isolated relay terminals 11 and 14.Trace matching X-input and local 0 V terminals.Keep the relay coil circuit separate.2Tag and landMark the CONTROLLER SIDE jacket at both ends.Match every E02 11/14 label at both ends.Use end-tower bottom opening 02.3Check alarmsProve one fault and reset at a time.Verify the actual tower and displayed X channel.Record positioning and alarm evidence separately.BENCH TESTIsolated USB testing verified X1 on/off. A separate power-cycle test retained module address 2 and 9600 baud.FIELD CHECKVerify the reported tower and live position. The shown input circuit uses local +12 V COM and isolated 11/14 contacts.Cable schedule R03 • pp. 4–5 | Cabinet assembly pp. 12, 14–16 | X1 standalone USB recordCABLE INDEXEN / 24 OF 80
Cellular gateway antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.AR1 / ANTENNA FEEDERSCellular gateway antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.MAIN CABINETCellular gatewayLTEPort on the fitted deviceM-AR1 4G LTEM-AR1 4G LTEROOF GLANDCheck the fitted position.Confirm matingconnector on site.Cellular antennaAntenna mating connector • factory-terminated coaxKeep labels clear of connector threads and seals.Main cabinet roof · verify the actual exitSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct portIdentify the device port marked LTE.Use the lead specified for this antenna.2Route the whole feederUse the approved roof exit and weather seal.Confirm clearance, bend radius and slack.3Label and proveApply the same jacket label at both ends.Check the commissioned signal for this link.BENCH TESTThe gateway used 4G on the board. Antenna connector and link margin were not separately recorded.FIELD CHECKConnector family and roof-hole position require hardware confirmation. Match both ends to the fitted feeder.Assembly drawing, p. 5. R02, roof entry. R03, p. 4, complete feeder labels.CABLE INDEXEN / 25 OF 80
Pivot-center GPS A feederOne complete coaxial feeder. Apply the full jacket label to both ends.AR2 / ANTENNA FEEDERSPivot-center GPS A feederOne complete coaxial feeder. Apply the full jacket label to both ends.MAIN CABINETCellular gatewayGPSPort on the fitted deviceM-AR2 GPS AM-AR2 GPS AROOF GLANDCheck the fitted position.Confirm matingconnector on site.GPS A antennaAntenna mating connector • factory-terminated coaxKeep labels clear of connector threads and seals.Main cabinet roof · verify the actual exitSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct portIdentify the device port marked GPS.Use the lead specified for this antenna.2Route the whole feederUse the approved roof exit and weather seal.Confirm clearance, bend radius and slack.3Label and proveApply the same jacket label at both ends.Check the commissioned signal for this link.BENCH TESTThe project recorded real position A. The feeder connector and signal margin were not separately recorded.FIELD CHECKConnector family and roof-hole position require hardware confirmation. Match both ends to the fitted feeder.Assembly drawing, p. 5. R02, roof entry. R03, p. 4, complete feeder labels.CABLE INDEXEN / 26 OF 80
Main local-radio antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.AR3 / ANTENNA FEEDERSMain local-radio antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.MAIN CABINETMain local radioANTPort on the fitted deviceM-AR3 RADIO 2.4GHZM-AR3 RADIO 2.4GHZROOF GLANDCheck the fitted position.Confirm matingconnector on site.Main 2.4 GHz antennaAntenna mating connector • factory-terminated coaxKeep labels clear of connector threads and seals.Main cabinet roof · verify the actual exitSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct portIdentify the device port marked ANT.Use the lead specified for this antenna.2Route the whole feederUse the approved roof exit and weather seal.Confirm clearance, bend radius and slack.3Label and proveApply the same jacket label at both ends.Check the commissioned signal for this link.BENCH TESTProject board records show the radio pair carried position B. There is no feeder-specific RF test in the record.FIELD CHECKConnector family and roof-hole position require hardware confirmation. Match both ends to the fitted feeder.Assembly drawing, p. 5. R02, roof entry. R03, p. 4, complete feeder labels.CABLE INDEXEN / 27 OF 80
Tower local-radio antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.BR1 / ANTENNA FEEDERSTower local-radio antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.END-TOWER CABINETTower local radioANTPort on the fitted deviceE-BR1 RADIO 2.4GHZE-BR1 RADIO 2.4GHZROOF GLANDCheck the fitted position.Confirm matingconnector on site.Tower 2.4 GHz antennaAntenna mating connector • factory-terminated coaxKeep labels clear of connector threads and seals.Tower cabinet roof · verify the actual exitSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct portIdentify the device port marked ANT.Use the lead specified for this antenna.2Route the whole feederUse the approved roof exit and weather seal.Confirm clearance, bend radius and slack.3Label and proveApply the same jacket label at both ends.Check the commissioned signal for this link.BENCH TESTProject board records show the radio pair carried position B. There is no feeder-specific RF test in the record.FIELD CHECKConnector family and roof-hole position require hardware confirmation. Match both ends to the fitted feeder.Assembly drawing, p. 15. R03, p. 4, complete feeder labels.CABLE INDEXEN / 28 OF 80
End-tower GPS B antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.BR2 / ANTENNA FEEDERSEnd-tower GPS B antenna feederOne complete coaxial feeder. Apply the full jacket label to both ends.END-TOWER CABINETGPS B receiverANTPort on the fitted deviceE-BR2 GPS BE-BR2 GPS BROOF GLANDCheck the fitted position.Confirm matingconnector on site.GPS B antennaAntenna mating connector • factory-terminated coaxKeep labels clear of connector threads and seals.Tower cabinet roof · verify the actual exitSolid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct portIdentify the device port marked ANT.Use the lead specified for this antenna.2Route the whole feederUse the approved roof exit and weather seal.Confirm clearance, bend radius and slack.3Label and proveApply the same jacket label at both ends.Check the commissioned signal for this link.BENCH TESTThe project recorded real position B. The feeder connector and signal margin were not separately recorded.FIELD CHECKConnector family and roof-hole position require hardware confirmation. Match both ends to the fitted feeder.Assembly drawing, p. 15. R03, p. 4, complete feeder labels.CABLE INDEXEN / 29 OF 80
Run / stop · controller side cableM02 RUN / STOP CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationM02-C / SEPARATE RELAY BOXRun / stop · controller side cableM02 RUN / STOP CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationMAIN RETROFIT CABINETSEPARATE ISOLATION BOXXC-1a · CH1COMApprovedthrough-pointVERIFYM02-CH1-COMM02-CH1-COMXC-1b · CH1 NOApprovedthrough-pointVERIFYM02-CH1-NOM02-CH1-NOXF-1 → DI1K1 contact 11M02-K1-11M02-K1-11XF-1R → DGNDK1 contact 14M02-K1-14M02-K1-14Main bottom opening 02Relay-box entry · site layoutM02 RUN / STOP CONTROLLER SIDEM02 RUN / STOP CONTROLLER SIDEMain bottom opening 02 to relay box • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Mark this segmentIdentify main cabinet opening 02 and relay K1.Apply the CONTROLLER SIDE jacket ID at both ends.Mark every core before termination.2Land the dry pairLand K1 contact 11 at XF-1 and 14 at XF-1R.Follow XF-1 to DI1. Follow XF-1R to DGND.Confirm any command through-points on site.3Test at the controllerCheck core continuity with both ends disconnected.Operate the approved test contact and observe DI1.Release the test contact and verify the normal state.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the independent run return on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M02 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 30 OF 80
Run / stop · machine side cableM02 RUN / STOP MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationM02-M / SEPARATE RELAY BOXRun / stop · machine side cableM02 RUN / STOP MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationSEPARATE ISOLATION BOXORIGINAL MACHINE CABINETApprovedthrough-pointVERIFYRequestcommonVERIFYM02-CH1-COMM02-CH1-COMApprovedthrough-pointVERIFYRequest inputVERIFYM02-CH1-NOM02-CH1-NOK1 coil A1Run statussourceVERIFYM02-K1-A1M02-K1-A1K1 coil A2Matching circuitreturnVERIFYM02-K1-A2M02-K1-A2Relay-box entry · site layoutOriginal cabinet entry · site layoutM02 RUN / STOP MACHINE SIDEM02 RUN / STOP MACHINE SIDERelay box to original machine cabinet • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace the original circuitTrace the start, hold and stop chain.Confirm its status source and same-circuit return.Record the actual original-panel terminals.2Label and landApply the MACHINE SIDE jacket ID at both ends.Use A1/A2 only for the verified relay coil circuit.Confirm any command through-points on site.3Verify this segmentWith ends isolated, ring out each core by its tag.Prove that the coil follows the actual field status.Witness the independent run return.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the independent run return on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M02 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 31 OF 80
Forward · controller side cableM03 FORWARD CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationM03-C / SEPARATE RELAY BOXForward · controller side cableM03 FORWARD CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationMAIN RETROFIT CABINETSEPARATE ISOLATION BOXXC-2a · CH2COMApprovedthrough-pointVERIFYM03-CH2-COMM03-CH2-COMXC-2b · CH2 NOApprovedthrough-pointVERIFYM03-CH2-NOM03-CH2-NOXF-2 → DI2K2 contact 11M03-K2-11M03-K2-11XF-2R → DGNDK2 contact 14M03-K2-14M03-K2-14Main bottom opening 03Relay-box entry · site layoutM03 FORWARD CONTROLLER SIDEM03 FORWARD CONTROLLER SIDEMain bottom opening 03 to relay box • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Mark this segmentIdentify main cabinet opening 03 and relay K2.Apply the CONTROLLER SIDE jacket ID at both ends.Mark every core before termination.2Land the dry pairLand K2 contact 11 at XF-2 and 14 at XF-2R.Follow XF-2 to DI2. Follow XF-2R to DGND.Confirm any command through-points on site.3Test at the controllerCheck core continuity with both ends disconnected.Operate the approved test contact and observe DI2.Release the test contact and verify the normal state.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and forward status on DI2 on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M03 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 32 OF 80
Forward · machine side cableM03 FORWARD MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationM03-M / SEPARATE RELAY BOXForward · machine side cableM03 FORWARD MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationSEPARATE ISOLATION BOXORIGINAL MACHINE CABINETApprovedthrough-pointVERIFYRequestcommonVERIFYM03-CH2-COMM03-CH2-COMApprovedthrough-pointVERIFYRequest inputVERIFYM03-CH2-NOM03-CH2-NOK2 coil A1HL5 statuscandidateVERIFYM03-K2-A1M03-K2-A1K2 coil A2Matching circuitreturnVERIFYM03-K2-A2M03-K2-A2Relay-box entry · site layoutOriginal cabinet entry · site layoutM03 FORWARD MACHINE SIDEM03 FORWARD MACHINE SIDERelay box to original machine cabinet • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace the original circuitTrace 3SS wire 23 and forward wire 11.Confirm its status source and same-circuit return.Record the actual original-panel terminals.2Label and landApply the MACHINE SIDE jacket ID at both ends.Use A1/A2 only for the verified relay coil circuit.Confirm any command through-points on site.3Verify this segmentWith ends isolated, ring out each core by its tag.Prove that the coil follows the actual field status.Witness forward status on DI2.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and forward status on DI2 on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M03 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 33 OF 80
Reverse · controller side cableM04 REVERSE CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationM04-C / SEPARATE RELAY BOXReverse · controller side cableM04 REVERSE CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationMAIN RETROFIT CABINETSEPARATE ISOLATION BOXXC-3a · CH3COMApprovedthrough-pointVERIFYM04-CH3-COMM04-CH3-COMXC-3b · CH3 NOApprovedthrough-pointVERIFYM04-CH3-NOM04-CH3-NOXF-3 → DI3K3 contact 11M04-K3-11M04-K3-11XF-3R → DGNDK3 contact 14M04-K3-14M04-K3-14Main bottom opening 04Relay-box entry · site layoutM04 REVERSE CONTROLLER SIDEM04 REVERSE CONTROLLER SIDEMain bottom opening 04 to relay box • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Mark this segmentIdentify main cabinet opening 04 and relay K3.Apply the CONTROLLER SIDE jacket ID at both ends.Mark every core before termination.2Land the dry pairLand K3 contact 11 at XF-3 and 14 at XF-3R.Follow XF-3 to DI3. Follow XF-3R to DGND.Confirm any command through-points on site.3Test at the controllerCheck core continuity with both ends disconnected.Operate the approved test contact and observe DI3.Release the test contact and verify the normal state.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and reverse status on DI3 on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M04 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 34 OF 80
Reverse · machine side cableM04 REVERSE MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationM04-M / SEPARATE RELAY BOXReverse · machine side cableM04 REVERSE MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationSEPARATE ISOLATION BOXORIGINAL MACHINE CABINETApprovedthrough-pointVERIFYRequestcommonVERIFYM04-CH3-COMM04-CH3-COMApprovedthrough-pointVERIFYRequest inputVERIFYM04-CH3-NOM04-CH3-NOK3 coil A1HL4 statuscandidateVERIFYM04-K3-A1M04-K3-A1K3 coil A2Matching circuitreturnVERIFYM04-K3-A2M04-K3-A2Relay-box entry · site layoutOriginal cabinet entry · site layoutM04 REVERSE MACHINE SIDEM04 REVERSE MACHINE SIDERelay box to original machine cabinet • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace the original circuitTrace 3SS wire 23 and reverse wire 12.Confirm its status source and same-circuit return.Record the actual original-panel terminals.2Label and landApply the MACHINE SIDE jacket ID at both ends.Use A1/A2 only for the verified relay coil circuit.Confirm any command through-points on site.3Verify this segmentWith ends isolated, ring out each core by its tag.Prove that the coil follows the actual field status.Witness reverse status on DI3.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and reverse status on DI3 on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M04 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 35 OF 80
Panel fault · controller side cableM05 PANEL FAULT CONTROLLER SIDE • 2 × 0.75 mm² • Optional separate-box installationM05-C / SEPARATE RELAY BOXPanel fault · controller side cableM05 PANEL FAULT CONTROLLER SIDE • 2 × 0.75 mm² • Optional separate-box installationMAIN RETROFIT CABINETSEPARATE ISOLATION BOXXF-5 → DI5K5 contact 11M05-K5-11M05-K5-11XF-5R → DGNDK5 contact 14M05-K5-14M05-K5-14Main bottom opening 05Relay-box entry · site layoutM05 PANEL FAULT CONTROLLER SIDEM05 PANEL FAULT CONTROLLER SIDEMain bottom opening 05 to relay box • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Mark this segmentIdentify main cabinet opening 05 and relay K5.Apply the CONTROLLER SIDE jacket ID at both ends.Mark every core before termination.2Land the dry pairLand K5 contact 11 at XF-5 and 14 at XF-5R.Follow XF-5 to DI5. Follow XF-5R to DGND.Keep both cores in the isolated input circuit.3Test at the controllerCheck core continuity with both ends disconnected.Operate the approved test contact and observe DI5.Release the test contact and verify the normal state.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the independent panel fault return on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M05 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 36 OF 80
Panel fault · machine side cableM05 PANEL FAULT MACHINE SIDE • 2 × 0.75 mm² • Optional separate-box installationM05-M / SEPARATE RELAY BOXPanel fault · machine side cableM05 PANEL FAULT MACHINE SIDE • 2 × 0.75 mm² • Optional separate-box installationSEPARATE ISOLATION BOXORIGINAL MACHINE CABINETK5 coil A1Panel fault sourceVERIFYM05-K5-A1M05-K5-A1K5 coil A2Matching circuitreturnVERIFYM05-K5-A2M05-K5-A2Relay-box entry · site layoutOriginal cabinet entry · site layoutM05 PANEL FAULT MACHINE SIDEM05 PANEL FAULT MACHINE SIDERelay box to original machine cabinet • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace the original circuitVerify which signal means a general panel fault.Confirm its status source and same-circuit return.Record the actual original-panel terminals.2Label and landApply the MACHINE SIDE jacket ID at both ends.Use A1/A2 only for the verified relay coil circuit.Match the circuit to the fitted coil rating.3Verify this segmentWith ends isolated, ring out each core by its tag.Prove that the coil follows the actual field status.Witness the independent panel fault return.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the independent panel fault return on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M05 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 37 OF 80
Local mode · controller side cableM06 LOCAL MODE CONTROLLER SIDE • 2 × 0.75 mm² • Optional separate-box installationM06-C / SEPARATE RELAY BOXLocal mode · controller side cableM06 LOCAL MODE CONTROLLER SIDE • 2 × 0.75 mm² • Optional separate-box installationMAIN RETROFIT CABINETSEPARATE ISOLATION BOXXF-6 → DI6K6 contact 11M06-K6-11M06-K6-11XF-6R → DGNDK6 contact 14M06-K6-14M06-K6-14Main bottom opening 06Relay-box entry · site layoutM06 LOCAL MODE CONTROLLER SIDEM06 LOCAL MODE CONTROLLER SIDEMain bottom opening 06 to relay box • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Mark this segmentIdentify main cabinet opening 06 and relay K6.Apply the CONTROLLER SIDE jacket ID at both ends.Mark every core before termination.2Land the dry pairLand K6 contact 11 at XF-6 and 14 at XF-6R.Follow XF-6 to DI6. Follow XF-6R to DGND.Keep both cores in the isolated input circuit.3Test at the controllerCheck core continuity with both ends disconnected.Operate the approved test contact and observe DI6.Release the test contact and verify the normal state.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the local mode return on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M06 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 38 OF 80
Local mode · machine side cableM06 LOCAL MODE MACHINE SIDE • 2 × 0.75 mm² • Optional separate-box installationM06-M / SEPARATE RELAY BOXLocal mode · machine side cableM06 LOCAL MODE MACHINE SIDE • 2 × 0.75 mm² • Optional separate-box installationSEPARATE ISOLATION BOXORIGINAL MACHINE CABINETK6 coil A1Local mode sourceVERIFYM06-K6-A1M06-K6-A1K6 coil A2Matching circuitreturnVERIFYM06-K6-A2M06-K6-A2Relay-box entry · site layoutOriginal cabinet entry · site layoutM06 LOCAL MODE MACHINE SIDEM06 LOCAL MODE MACHINE SIDERelay box to original machine cabinet • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace the original circuitIdentify a separate mode indication contact.Confirm its status source and same-circuit return.Record the actual original-panel terminals.2Label and landApply the MACHINE SIDE jacket ID at both ends.Use A1/A2 only for the verified relay coil circuit.Match the circuit to the fitted coil rating.3Verify this segmentWith ends isolated, ring out each core by its tag.Prove that the coil follows the actual field status.Witness the local mode return.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the local mode return on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M06 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 39 OF 80
Span spray · controller side cableM07 SPAN SPRAY CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationM07-C / SEPARATE RELAY BOXSpan spray · controller side cableM07 SPAN SPRAY CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationMAIN RETROFIT CABINETSEPARATE ISOLATION BOXXC-5a · CH5COMApprovedthrough-pointVERIFYM07-CH5-COMM07-CH5-COMXC-5b · CH5 NOApprovedthrough-pointVERIFYM07-CH5-NOM07-CH5-NOXF-7 → DI7K7 contact 11M07-K7-11M07-K7-11XF-7R → DGNDK7 contact 14M07-K7-14M07-K7-14Main bottom opening 07Relay-box entry · site layoutM07 SPAN SPRAY CONTROLLER SIDEM07 SPAN SPRAY CONTROLLER SIDEMain bottom opening 07 to relay box • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Mark this segmentIdentify main cabinet opening 07 and relay K7.Apply the CONTROLLER SIDE jacket ID at both ends.Mark every core before termination.2Land the dry pairLand K7 contact 11 at XF-7 and 14 at XF-7R.Follow XF-7 to DI7. Follow XF-7R to DGND.Confirm any command through-points on site.3Test at the controllerCheck core continuity with both ends disconnected.Operate the approved test contact and observe DI7.Release the test contact and verify the normal state.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and water status under an approved wet test on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M07 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 40 OF 80
Span spray · machine side cableM07 SPAN SPRAY MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationM07-M / SEPARATE RELAY BOXSpan spray · machine side cableM07 SPAN SPRAY MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationSEPARATE ISOLATION BOXORIGINAL MACHINE CABINETApprovedthrough-pointVERIFYRequestcommonVERIFYM07-CH5-COMM07-CH5-COMApprovedthrough-pointVERIFYRequest inputVERIFYM07-CH5-NOM07-CH5-NOK7 coil A1Independentwater statusVERIFYM07-K7-A1M07-K7-A1K7 coil A2Matching circuitreturnVERIFYM07-K7-A2M07-K7-A2Relay-box entry · site layoutOriginal cabinet entry · site layoutM07 SPAN SPRAY MACHINE SIDEM07 SPAN SPRAY MACHINE SIDERelay box to original machine cabinet • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace the original circuitTrace the pump or valve permit and its feedback.Confirm its status source and same-circuit return.Record the actual original-panel terminals.2Label and landApply the MACHINE SIDE jacket ID at both ends.Use A1/A2 only for the verified relay coil circuit.Confirm any command through-points on site.3Verify this segmentWith ends isolated, ring out each core by its tag.Prove that the coil follows the actual field status.Witness water status under an approved wet test.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and water status under an approved wet test on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M07 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 41 OF 80
End gun · controller side cableM08 END GUN CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationM08-C / SEPARATE RELAY BOXEnd gun · controller side cableM08 END GUN CONTROLLER SIDE • 4 × 0.75 mm² • Optional separate-box installationMAIN RETROFIT CABINETSEPARATE ISOLATION BOXXC-4a · CH4COMApprovedthrough-pointVERIFYM08-CH4-COMM08-CH4-COMXC-4b · CH4 NOApprovedthrough-pointVERIFYM08-CH4-NOM08-CH4-NOXF-4 → DI4K4 contact 11M08-K4-11M08-K4-11XF-4R → DGNDK4 contact 14M08-K4-14M08-K4-14Main bottom opening 08Relay-box entry · site layoutM08 END GUN CONTROLLER SIDEM08 END GUN CONTROLLER SIDEMain bottom opening 08 to relay box • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Mark this segmentIdentify main cabinet opening 08 and relay K4.Apply the CONTROLLER SIDE jacket ID at both ends.Mark every core before termination.2Land the dry pairLand K4 contact 11 at XF-4 and 14 at XF-4R.Follow XF-4 to DI4. Follow XF-4R to DGND.Confirm any command through-points on site.3Test at the controllerCheck core continuity with both ends disconnected.Operate the approved test contact and observe DI4.Release the test contact and verify the normal state.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the end-gun feedback and actual spray on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M08 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 42 OF 80
End gun · machine side cableM08 END GUN MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationM08-M / SEPARATE RELAY BOXEnd gun · machine side cableM08 END GUN MACHINE SIDE • 4 × 0.75 mm² • Optional separate-box installationSEPARATE ISOLATION BOXORIGINAL MACHINE CABINETApprovedthrough-pointVERIFYRequestcommonVERIFYM08-CH4-COMM08-CH4-COMApprovedthrough-pointVERIFYRequest inputVERIFYM08-CH4-NOM08-CH4-NOK4 coil A1Valve orbooster statusVERIFYM08-K4-A1M08-K4-A1K4 coil A2Matching circuitreturnVERIFYM08-K4-A2M08-K4-A2Relay-box entry · site layoutOriginal cabinet entry · site layoutM08 END GUN MACHINE SIDEM08 END GUN MACHINE SIDERelay box to original machine cabinet • Confirm unnumbered entry locations on site.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Trace the original circuitTrace switch wire 25 and wire 5 at TB3-6.Confirm its status source and same-circuit return.Record the actual original-panel terminals.2Label and landApply the MACHINE SIDE jacket ID at both ends.Use A1/A2 only for the verified relay coil circuit.Confirm any command through-points on site.3Verify this segmentWith ends isolated, ring out each core by its tag.Prove that the coil follows the actual field status.Witness the end-gun feedback and actual spray.BENCH TESTThis separate-box field cable has no recorded end-to-end bench test.FIELD CHECKConfirm the cable route, core continuity and the end-gun feedback and actual spray on the installed machine.Cable labels R03, pp. 3 and 5 / Main terminal schedule R02, M08 / Cabinet assembly, pp. 6–8CABLE INDEXEN / 43 OF 80
Main cabinet AC feed-through and earthThree separate pigtails feed the 24 V DC supply and the protective-earth rail.MI01 / MAIN INTERIORMain cabinet AC feed-through and earthThree separate pigtails feed the 24 V DC supply and the protective-earth rail.Inside main cabinet · separated AC groupLower AC and PE terminalsDC supply and PE railX0-L, insideSupply AC LL (function)L (function)X0-N, insideSupply AC NN (function)N (function)PE terminal, insideDedicated PE railPE (function)PE (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1LocateFind L, N and PE on the lower rail.Work with both sides isolated and verified.2TraceFollow L and N to the supply input.Follow PE to the dedicated bonding rail.3ProveCheck each path and the earth continuity.Record the approved branch protection.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKVerify the AC branch, protection and any enclosure bonding against the installed machine.Assembly drawing, pp. 2–3. R02, opening 1.CABLE INDEXEN / 44 OF 80
24 V DC supply distributionPlace the positive and return leads into separate distribution blocks.MI02 / MAIN INTERIOR24 V DC supply distributionPlace the positive and return leads into separate distribution blocks.Inside main cabinet · DC ductDC power supplyDC distribution blocksDC +V+24 V block,position 1+24 V (function)+24 V (function)DC −V0 V block, position10 V (function)0 V (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1IdentifyFind +V and −V on the supply.The block positions follow the assembly drawing.2ConnectConnect the positive lead to its own block.Run the 0 V lead to the separate return block.3ProveVerify polarity at the blocks before loading.Record voltage with the fitted loads connected.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKVerify actual wire gauge, polarity and voltage. Positive and return distribution blocks stay separate.Assembly drawing, p. 4.CABLE INDEXEN / 45 OF 80
Main controller 24 V branchFollow the positive feed through its own fuse and the return directly to the device.MI03 / MAIN INTERIORMain controller 24 V branchFollow the positive feed through its own fuse and the return directly to the device.Inside main cabinet · protected DC branch24 V distribution blocksBranch fuseMain controller+24 V block, position 20 V block, position 2+24 V feed (function)+24 V load (function)Supply endLoad end0 V return (function)Power +Power −The two positive leads meet only through the branch fuse. Trace the return directly to 0 V.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1IdentifyLocate position 2 on both DC blocks.Confirm the fuse holder and protection rating.2Trace the branchTrace the two positive pieces via the fuse.Trace the 0 V lead directly to the device.3Prove polarityCheck the marked device terminals before power.Record voltage at the device under load.BENCH TESTNo branch-specific bench voltage or continuity reading is recorded for this fused feed.FIELD CHECKConfirm actual device pin numbering and the approved fuse before connecting the branch.Assembly drawing, p. 4, position 2CABLE INDEXEN / 46 OF 80
Cellular gateway 24 V branchFollow the positive feed through its own fuse and the return directly to the device.MI04A / MAIN INTERIORCellular gateway 24 V branchFollow the positive feed through its own fuse and the return directly to the device.Inside main cabinet · protected DC branch24 V distribution blocksBranch fuseCellular gateway+24 V block, position 30 V block, position 3+24 V feed (function)+24 V load (function)Supply endLoad end0 V return (function)Power plug pin 2 (+)Power plug pin 1 (−)The two positive leads meet only through the branch fuse. Trace the return directly to 0 V.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1IdentifyLocate position 3 on both DC blocks.Confirm the fuse holder and protection rating.2Trace the branchTrace the two positive pieces via the fuse.Trace the 0 V lead directly to the device.3Prove polarityCheck the marked device terminals before power.Record voltage at the device under load.BENCH TESTNo branch-specific bench voltage or continuity reading is recorded for this fused feed.FIELD CHECKConfirm actual device pin numbering and the approved fuse before connecting the branch.Assembly drawing, p. 4, position 3CABLE INDEXEN / 47 OF 80
Main local radio 24 V branchFollow the positive feed through its own fuse and the return directly to the device.MI04B / MAIN INTERIORMain local radio 24 V branchFollow the positive feed through its own fuse and the return directly to the device.Inside main cabinet · protected DC branch24 V distribution blocksBranch fuseMain local radio+24 V block, position 40 V block, position 4+24 V feed (function)+24 V load (function)Supply endLoad end0 V return (function)Four-pin plug 1 (+)Four-pin plug 2 (−)The two positive leads meet only through the branch fuse. Trace the return directly to 0 V.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1IdentifyLocate position 4 on both DC blocks.Confirm the fuse holder and protection rating.2Trace the branchTrace the two positive pieces via the fuse.Trace the 0 V lead directly to the device.3Prove polarityCheck the marked device terminals before power.Record voltage at the device under load.BENCH TESTNo branch-specific bench voltage or continuity reading is recorded for this fused feed.FIELD CHECKConfirm actual device pin numbering and the approved fuse before connecting the branch.Assembly drawing, p. 4, position 4CABLE INDEXEN / 48 OF 80
Controller to gateway EthernetThis factory patch cable carries the cabinet’s wired data link.MI05 / MAIN INTERIORController to gateway EthernetThis factory patch cable carries the cabinet’s wired data link.Inside main cabinet · data wire ductMain controllerETHCellular gatewayLANFactory Ethernet leadFactory Ethernet leadFit the complete patch lead from ETH to LAN. Leave the molded plugs intact.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Match the portsIdentify the controller ETH port.Identify the gateway LAN port.2Seat the plugsRoute the factory lead clear of AC wiring.Seat each plug and check the retaining clip.3Prove the linkCheck physical link indicators when fitted.Verify the controller reaches its service.BENCH TESTThe controller and gateway carried board telemetry. The record does not give a cable-specific link-speed test.FIELD CHECKCheck the fitted lead and link. Keep this data lead separate from the cellular and radio antenna feeders.Assembly drawing, p. 5. Project board communications record.CABLE INDEXEN / 49 OF 80
Controller to main radio RS-485One twisted pair connects the controller to the main radio’s four-pin connector.MI06 / MAIN INTERIORController to main radio RS-485One twisted pair connects the controller to the main radio’s four-pin connector.Inside main cabinet · data wire ductMain controllerMain local radioRS-485 A+Four-pin plug 4 / AA (function)A (function)RS-485 B−Four-pin plug 3 / BB (function)B (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1IdentifyFind controller A+ and B−.Match the radio plug view and pin numbers.2Trace two coresConnect A+ to pin 4 / A.Connect B− to pin 3 / B.3Prove dataCheck the disconnected pair for continuity.Check fresh position B reports across the link.BENCH TESTThe paired radios carried position B at 9600 baud during the recorded board test.FIELD CHECKVerify the fitted cable, shield and serial settings. The radio hop between cabinets is wireless.Assembly drawing, p. 5. Two-radio position return record, 11 Nov 2026.CABLE INDEXEN / 50 OF 80
Run and direction command pigtailsOne wire per contact terminal. Keep each command pair separate on the lower strip.MI07A / MAIN INTERIORRun and direction command pigtailsOne wire per contact terminal. Keep each command pair separate on the lower strip.Inside main cabinet · command wire ductMain controller relay outputsLower command strip XCCH1 COMXC-1a,insideCH1 COM (function)CH1 COM (function)CH1 NOXC-1b,insideCH1 NO (function)CH1 NO (function)CH2 COMXC-2a,insideCH2 COM (function)CH2 COM (function)CH2 NOXC-2b,insideCH2 NO (function)CH2 NO (function)CH3 COMXC-3a,insideCH3 COM (function)CH3 COM (function)CH3 NOXC-3b,insideCH3 NO (function)CH3 NO (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1LocateFind the channel’s COM and NO at the controller.Identify the same channel pair on the XC strip.2Trace one coreRun COM to the a terminal and NO to b.Keep separate command pairs electrically apart.3Prove at the stripCheck continuity on the isolated pigtails.Use the external card for the original cabinet.BENCH TESTThe existing bench harness returned the run, forward and reverse contacts on the 13 Nov board test.FIELD CHECKRemove bench jumpers before field connection. Keep original interlocks and confirm field-side terminals.Assembly drawing, pp. 2, 6. R02, XC terminal designations. Contact bench, 13 Nov 2026.CABLE INDEXEN / 51 OF 80
End-gun and span-spray command pigtailsOne wire per contact terminal. Keep each command pair separate on the lower strip.MI07B / MAIN INTERIOREnd-gun and span-spray command pigtailsOne wire per contact terminal. Keep each command pair separate on the lower strip.Inside main cabinet · command wire ductMain controller relay outputsLower command strip XCCH4 COMXC-4a, insideCH4 COM (function)CH4 COM (function)CH4 NOXC-4b, insideCH4 NO (function)CH4 NO (function)CH5 COMXC-5a, insideCH5 COM (function)CH5 COM (function)CH5 NOXC-5b, insideCH5 NO (function)CH5 NO (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1LocateFind the channel’s COM and NO at the controller.Identify the same channel pair on the XC strip.2Trace one coreRun COM to the a terminal and NO to b.Keep separate command pairs electrically apart.3Prove at the stripCheck continuity on the isolated pigtails.Use the external card for the original cabinet.BENCH TESTThe existing harness returned the end-gun contact. The span-water circuit was left open on the 13 Nov setup.FIELD CHECKRemove bench jumpers before field connection. Keep original interlocks and confirm field-side terminals.Assembly drawing, pp. 2, 6. R02, XC terminal designations. Contact bench, 13 Nov 2026.CABLE INDEXEN / 52 OF 80
Feedback strip to controller inputsSeven signal pigtails follow terminal number from the feedback strip to the controller.MI08 / MAIN INTERIORFeedback strip to controller inputsSeven signal pigtails follow terminal number from the feedback strip to the controller.Inside main cabinet · feedback wire ductLower feedback signals XFMain controller digital inputsXF-1,insideDI1DI1 (function)DI1 (function)XF-2,insideDI2DI2 (function)DI2 (function)XF-3,insideDI3DI3 (function)DI3 (function)XF-4,insideDI4DI4 (function)DI4 (function)XF-5,insideDI5DI5 (function)DI5 (function)XF-6,insideDI6DI6 (function)DI6 (function)XF-7,insideDI7DI7 (function)DI7 (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the signal terminalsIdentify the signal side of each XF pair.Use its matching controller DI number.2Trace the coresConnect XF-n to DI-n one channel at a time.Leave the matching R core in the return bank.3Prove each dry inputTest only using the approved dry input path.Confirm the other inputs stay in their state.BENCH TESTThe bench captured run, direction and end-gun contact inputs. DI7 was open.FIELD CHECKVerify installed channels and feedback meaning. Keep any original circuit voltage out of DI and DGND.Assembly drawing, p. 7. R02, feedback terminals. Contact bench, 13 Nov 2026.CABLE INDEXEN / 53 OF 80
Feedback returns to block 1Route each dry-contact return to its assigned position in the main feedback return system.MI09A / MAIN INTERIORFeedback returns to block 1Route each dry-contact return to its assigned position in the main feedback return system.Inside main cabinet · feedback return ductLower feedback returns XFFeedback return block 1XF-1R, insideBlock 1, position 2DI1 return (function)DI1 return (function)XF-2R, insideBlock 1, position 3DI2 return (function)DI2 return (function)XF-3R, insideBlock 1, position 4DI3 return (function)DI3 return (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the matching returnsIdentify the R terminal of each XF pair.Use the correct five-position return block.2Route the coresLand each return on its listed position.Leave the signal cores on their own paths.3Trace to DGNDFollow the block links on MI10A and MI10B.Check that powered feedback remains isolated.BENCH TESTThe drawing specifies the return positions. The reference bench left DI7 open.FIELD CHECKVerify each return and check that no original cabinet voltage reaches the feedback input or DGND.Assembly drawing, pp. 7–8. R02 and R03, feedback terminal names.CABLE INDEXEN / 54 OF 80
Feedback returns to block 2Route each dry-contact return to its assigned position in the main feedback return system.MI09B / MAIN INTERIORFeedback returns to block 2Route each dry-contact return to its assigned position in the main feedback return system.Inside main cabinet · feedback return ductLower feedback returns XFFeedback return block 2XF-4R, insideBlock 2,position 2DI4 return (function)DI4 return (function)XF-5R, insideBlock 2,position 3DI5 return (function)DI5 return (function)XF-6R, insideBlock 2,position 4DI6 return (function)DI6 return (function)XF-7R, insideBlock 2,position 5DI7 return (function)DI7 return (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the matching returnsIdentify the R terminal of each XF pair.Use the correct five-position return block.2Route the coresLand each return on its listed position.Leave the signal cores on their own paths.3Trace to DGNDFollow the block links on MI10A and MI10B.Check that powered feedback remains isolated.BENCH TESTThe drawing specifies the return positions. The reference bench left DI7 open.FIELD CHECKVerify each return and check that no original cabinet voltage reaches the feedback input or DGND.Assembly drawing, pp. 7–8. R02 and R03, feedback terminal names.CABLE INDEXEN / 55 OF 80
DGND to return block 1This jumper connects the controller input common to the first feedback return block.MI10A / MAIN INTERIORDGND to return block 1This jumper connects the controller input common to the first feedback return block.Inside main cabinet · feedback commonMain controllerFeedback return block 1DGNDBlock 1, position 1Feedback return (function)Feedback return (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1IdentifyFind DGND beside the controller inputs.Find position 1 on feedback return block 1.2Route the jumperJoin DGND to that position.Keep this path inside the dry feedback circuit.3Trace to the pairCheck isolated continuity to the return bank.Use MI10B for the link to the second block.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKVerify the return block as assembled. Keep original cabinet return voltage isolated from DGND.Assembly drawing, p. 8.CABLE INDEXEN / 56 OF 80
Return block 1 to return block 2The two feedback return blocks are joined by one short jumper.MI10B / MAIN INTERIORReturn block 1 to return block 2The two feedback return blocks are joined by one short jumper.Inside main cabinet · feedback commonFeedback return block 1Feedback return block 2Block 1, position 5Block 2, position 1Feedback return (function)Feedback return (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Locate both blocksFind position 5 on block 1.Find position 1 on block 2.2Connect the linkFit one jumper using those two positions.Use the same feedback-return marking both ends.3Prove the commonConfirm continuity back to controller DGND.Keep individual input leads out of this link.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKCheck final continuity of the two return banks to DGND and record the installed jumper.Assembly drawing, p. 8, feedback return jumper.CABLE INDEXEN / 57 OF 80
Isolated run and direction feedbackThe relay coil remains on the original circuit side. These pigtails leave only the dry contacts.MI11 / MAIN INTERIORIsolated run and direction feedbackThe relay coil remains on the original circuit side. These pigtails leave only the dry contacts.Inside main cabinet · isolated return sideFeedback relay dry contactsLower feedback strip XFK1 contact11XF-1, relaysideM02-K1-11M02-K1-11K1 contact14XF-1R,relay sideM02-K1-14M02-K1-14K2 contact11XF-2, relaysideM03-K2-11M03-K2-11K2 contact14XF-2R,relay sideM03-K2-14M03-K2-14K3 contact11XF-3, relaysideM04-K3-11M04-K3-11K3 contact14XF-3R,relay sideM04-K3-14M04-K3-14Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct sideIdentify the 11 and 14 dry-contact terminals.Keep original-circuit voltage on the coil side.2Trace one relayTrace 11 to the matching XF signal terminal.Trace 14 to the matching XF return terminal.3Check the resultCheck each dry input and its return separately.Leave contact 12 unused on this arrangement.BENCH TESTThe assembly and R03 show the dry-side paths. Actual fitment and separate coil-circuit tests remain site work.FIELD CHECKUse these labels only on the 11/14 conductors. Record the approved coil rating and field feedback source.Assembly drawing, pp. 7–8. R03, p. 5. R02, dry-contact return map.CABLE INDEXEN / 58 OF 80
Isolated end-gun and panel fault feedbackThe relay coil remains on the original circuit side. These pigtails leave only the dry contacts.MI12 / MAIN INTERIORIsolated end-gun and panel fault feedbackThe relay coil remains on the original circuit side. These pigtails leave only the dry contacts.Inside main cabinet · isolated return sideFeedback relay dry contactsLower feedback strip XFK4 contact 11XF-4, relay sideM08-K4-11M08-K4-11K4 contact 14XF-4R, relaysideM08-K4-14M08-K4-14K5 contact 11XF-5, relay sideM05-K5-11M05-K5-11K5 contact 14XF-5R, relaysideM05-K5-14M05-K5-14Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct sideIdentify the 11 and 14 dry-contact terminals.Keep original-circuit voltage on the coil side.2Trace one relayTrace 11 to the matching XF signal terminal.Trace 14 to the matching XF return terminal.3Check the resultCheck each dry input and its return separately.Leave contact 12 unused on this arrangement.BENCH TESTThe assembly and R03 show the dry-side paths. Actual fitment and separate coil-circuit tests remain site work.FIELD CHECKUse these labels only on the 11/14 conductors. Record the approved coil rating and field feedback source.Assembly drawing, pp. 7–8. R03, p. 5. R02, dry-contact return map.CABLE INDEXEN / 59 OF 80
Isolated local mode and span-spray feedbackThe relay coil remains on the original circuit side. These pigtails leave only the dry contacts.MI13 / MAIN INTERIORIsolated local mode and span-spray feedbackThe relay coil remains on the original circuit side. These pigtails leave only the dry contacts.Inside main cabinet · isolated return sideFeedback relay dry contactsLower feedback strip XFK6 contact 11XF-6, relay sideM06-K6-11M06-K6-11K6 contact 14XF-6R, relaysideM06-K6-14M06-K6-14K7 contact 11XF-7, relay sideM07-K7-11M07-K7-11K7 contact 14XF-7R, relaysideM07-K7-14M07-K7-14Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the correct sideIdentify the 11 and 14 dry-contact terminals.Keep original-circuit voltage on the coil side.2Trace one relayTrace 11 to the matching XF signal terminal.Trace 14 to the matching XF return terminal.3Check the resultCheck each dry input and its return separately.Leave contact 12 unused on this arrangement.BENCH TESTThe assembly and R03 show the dry-side paths. Actual fitment and separate coil-circuit tests remain site work.FIELD CHECKUse these labels only on the 11/14 conductors. Record the approved coil rating and field feedback source.Assembly drawing, pp. 7–8. R03, p. 5. R02, dry-contact return map.CABLE INDEXEN / 60 OF 80
Option cabinet · isolated measurement pairReference low-voltage sample cabinet for cable monitoring. This is a separate optional assembly.MI14A / MAIN INTERIOROption cabinet · isolated measurement pairReference low-voltage sample cabinet for cable monitoring. This is a separate optional assembly.Separate optional monitor cabinet · low-voltage ductIsolated detection boardVoltage acquisition moduleSample output, pinTBDVERIFYSelected channelAIN+VERIFYSample + (function)Sample + (function)Same circuitreturn, pin TBDVERIFYSame channelAIN−VERIFYSample return (function)Sample return (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Confirm scopeIdentify the optional low-voltage monitor box.Obtain the signed detection-board drawing.2Trace one pairUse the same approved acquisition channel.Check the isolated 0–10 V signal range.3Keep the scope clearKeep this pair in the low-voltage wire duct.Use the separate approved power-circuit plan.BENCH TESTReference design only. Sample pins, channels and live field detection have not been established.FIELD CHECKConfirm the detection-board drawing and isolation. Leave the original power-circuit landings pending.Assembly drawing, pp. 9–10 and 17, optional monitor and separate sample-cable enclosure.CABLE INDEXEN / 61 OF 80
Option cabinet · acquisition module powerThe optional measurement module has a separate protected DC supply branch.MI14B / MAIN INTERIOROption cabinet · acquisition module powerThe optional measurement module has a separate protected DC supply branch.Separate optional monitor cabinet · low-voltage power ductMonitor DC supply branchVoltage acquisition moduleProtected +24 VbranchVERIFYModule power ++24 V (function)+24 V (function)Same branch 0 VVERIFYModule power −0 V (function)0 V (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the branchUse the approved monitor-cabinet DC plan.Confirm the branch terminals and protection.2Trace the two leadsFollow the protected positive feed to +.Return through the same 0 V supply branch.3Prove before connectingConfirm voltage and polarity at the module.Test the backup supply if one is fitted.BENCH TESTReference design only. The optional field module and backup runtime have not been established.FIELD CHECKConfirm protection, supply and backup duration on the selected monitor assembly.Assembly drawing, pp. 9–10, optional monitor low-voltage supply.CABLE INDEXEN / 62 OF 80
End tower AC feed-through and earthThree separate pigtails feed the 12 V DC supply and the protective-earth rail.EI01 / TOWER INTERIOREnd tower AC feed-through and earthThree separate pigtails feed the 12 V DC supply and the protective-earth rail.Inside end tower · separated AC groupLower AC and PE terminalsDC supply and PE railL feed-through,insideSupply AC LL (function)L (function)N feed-through,insideSupply AC NN (function)N (function)PE terminal, insideDedicated PE railPE (function)PE (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1LocateFind L, N and PE on the lower rail.Work with both sides isolated and verified.2TraceFollow L and N to the supply input.Follow PE to the dedicated bonding rail.3ProveCheck each path and the earth continuity.Record the approved branch protection.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKVerify the AC branch, protection and any enclosure bonding against the installed machine.Assembly drawing, pp. 12–13.CABLE INDEXEN / 63 OF 80
12 V DC supply distributionPlace the positive and return leads into separate distribution blocks.EI02 / TOWER INTERIOR12 V DC supply distributionPlace the positive and return leads into separate distribution blocks.Inside tower cabinet · DC ductDC power supplyDC distribution blocksDC +V+12 V block,position 1+12 V (function)+12 V (function)DC −V0 V block, position10 V (function)0 V (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1IdentifyFind +V and −V on the supply.The block positions follow the assembly drawing.2ConnectConnect the positive lead to its own block.Run the 0 V lead to the separate return block.3ProveVerify polarity at the blocks before loading.Record voltage with the fitted loads connected.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKVerify actual wire gauge, polarity and voltage. Positive and return distribution blocks stay separate.Assembly drawing, p. 14.CABLE INDEXEN / 64 OF 80
Tower local radio 12 V branchTwo separate power leads connect the device to the tower distribution blocks.EI03A / TOWER INTERIORTower local radio 12 V branchTwo separate power leads connect the device to the tower distribution blocks.Inside tower cabinet · DC branch12 V tower blocksTower local radio+12 V block,position 2Four-pin plug 1 /VCC+12 V (function)+12 V (function)0 V block, position2Four-pin plug 2 /GND0 V (function)0 V (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1LocateLocate position 2 on both tower blocks.Use the device connector labels and orientation.2ConnectKeep the positive and 0 V leads together.Land each core on its matching terminal.3Prove polarityMeasure at the device connector before loading.Verify voltage again with the device powered.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKCompare connector position with the fitted device and document the branch under load.Assembly drawing, p. 14, position 2CABLE INDEXEN / 65 OF 80
GPS B receiver 12 V branchTwo separate power leads connect the device to the tower distribution blocks.EI03B / TOWER INTERIORGPS B receiver 12 V branchTwo separate power leads connect the device to the tower distribution blocks.Inside tower cabinet · DC branch12 V tower blocksGPS B receiver+12 V block,position 3Lower row,rightmost ++12 V (function)+12 V (function)0 V block, position3Lower row, secondfrom right −0 V (function)0 V (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1LocateLocate position 3 on both tower blocks.Use the device connector labels and orientation.2ConnectKeep the positive and 0 V leads together.Land each core on its matching terminal.3Prove polarityMeasure at the device connector before loading.Verify voltage again with the device powered.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKCompare connector position with the fitted device and document the branch under load.Assembly drawing, p. 14, position 3CABLE INDEXEN / 66 OF 80
Tower input collector 12 V branchTwo separate power leads connect the device to the tower distribution blocks.EI03C / TOWER INTERIORTower input collector 12 V branchTwo separate power leads connect the device to the tower distribution blocks.Inside tower cabinet · DC branch12 V tower blocksTower input collector+12 V block,position 4Power connector ++12 V (function)+12 V (function)0 V block, position4Power connector −0 V (function)0 V (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1LocateLocate position 4 on both tower blocks.Use the device connector labels and orientation.2ConnectKeep the positive and 0 V leads together.Land each core on its matching terminal.3Prove polarityMeasure at the device connector before loading.Verify voltage again with the device powered.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKCompare connector position with the fitted device and document the branch under load.Assembly drawing, p. 14, position 4CABLE INDEXEN / 67 OF 80
Collector input COM positive leadThe shown input collector uses local +12 V at COM. This is separate from its power-terminal positive lead.EI04A / TOWER INTERIORCollector input COM positive leadThe shown input collector uses local +12 V at COM. This is separate from its power-terminal positive lead.Inside tower cabinet · input common12 V tower distributionTower input collector+12 V block,position 5Lower row COM,left position 5+12 V COM (function)+12 V COM (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the polesLocate position 5 of the positive DC block.Find COM at position 5 from the left.2Fit one leadLink the positive block to COM as shown.Follow EI04B for the separate 0 V return.3Verify the circuitConfirm this input common on the fitted unit.Prove one isolated dry contact at a time.BENCH TESTThis COM arrangement appears in the assembly drawing. X1 was toggled on an isolated module.FIELD CHECKVerify that the fitted collector requires positive COM before using the drawing.Assembly drawing, pp. 14, 16. Isolated X1 input test, 12 Nov 2026.CABLE INDEXEN / 68 OF 80
0 V feed to the tower return blockThe return block carries the four fault-pair returns back to the same local 0 V source.EI04B / TOWER INTERIOR0 V feed to the tower return blockThe return block carries the four fault-pair returns back to the same local 0 V source.Inside tower cabinet · low-voltage returnTower 0 V distributionTower fault return block0 V block, position5Fault return block,position 10 V jumper (function)0 V jumper (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the block positionsFind position 5 on the 0 V power block.Find position 1 on the fault return block.2Trace one jumperConnect these two 0 V positions.Use positions 2 to 5 for the fault pairs.3Prove the returnMeasure continuity with the system isolated.Keep the collector COM on its +12 V lead.BENCH TESTThe assembly drawing identifies both ends. No electrical measurement of these specific leads is recorded.FIELD CHECKVerify continuity to local 0 V. Keep the original powered fault circuits isolated from this return.Assembly drawing, p. 14, negative distribution position 5 to return position 1.CABLE INDEXEN / 69 OF 80
RS-485 · Tower local radioFollow this one twisted pair between the device and its assigned A and B splitter positions.EI05A / TOWER INTERIORRS-485 · Tower local radioFollow this one twisted pair between the device and its assigned A and B splitter positions.Inside tower cabinet · data wire ductTower local radioA and B splittersFour-pin plug 4 / AA block, position 1A (function)A (function)Four-pin plug 3 / BB block, position 1B (function)B (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify the pairFind the device A and B connections.Use position 1 on both splitters.2Trace and landTrace A and B separately before connection.Check the connector view and cable routing.3Prove on the busCheck that data updates over the fitted radio.Confirm the assigned serial settings in service.BENCH TESTPosition B was reported over the radio. The collector kept address 2 and 9600 baud after an isolated USB power cycle.FIELD CHECKVerify the assembled shared radio bus with both devices reporting and each fitted tower fault cycling.Assembly drawing, p. 15. Radio return and tower collector USB verification records.CABLE INDEXEN / 70 OF 80
RS-485 · GPS B receiverFollow this one twisted pair between the device and its assigned A and B splitter positions.EI05B / TOWER INTERIORRS-485 · GPS B receiverFollow this one twisted pair between the device and its assigned A and B splitter positions.Inside tower cabinet · data wire ductA and B splittersGPS B receiverA block, position 2Lower row,leftmost AA (function)A (function)B block, position 2Lower row, secondfrom left BB (function)B (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify the pairFind the device A and B connections.Use position 2 on both splitters.2Trace and landTrace A and B separately before connection.Check the connector view and cable routing.3Prove on the busCheck that data updates over the fitted radio.Confirm the assigned serial settings in service.BENCH TESTPosition B was reported over the radio. The collector kept address 2 and 9600 baud after an isolated USB power cycle.FIELD CHECKVerify the assembled shared radio bus with both devices reporting and each fitted tower fault cycling.Assembly drawing, p. 15. Radio return and tower collector USB verification records.CABLE INDEXEN / 71 OF 80
RS-485 · Tower input collectorFollow this one twisted pair between the device and its assigned A and B splitter positions.EI05C / TOWER INTERIORRS-485 · Tower input collectorFollow this one twisted pair between the device and its assigned A and B splitter positions.Inside tower cabinet · data wire ductA and B splittersTower input collectorA block, position 3Lower row, leftposition 6 / A/HA (function)A (function)B block, position 3Lower row, leftposition 7 / B/LB (function)B (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Identify the pairFind the device A and B connections.Use position 3 on both splitters.2Trace and landTrace A and B separately before connection.Check the connector view and cable routing.3Prove on the busCheck that data updates over the fitted radio.Confirm the assigned serial settings in service.BENCH TESTPosition B was reported over the radio. The collector kept address 2 and 9600 baud after an isolated USB power cycle.FIELD CHECKVerify the assembled shared radio bus with both devices reporting and each fitted tower fault cycling.Assembly drawing, p. 15. Radio return and tower collector USB verification records.CABLE INDEXEN / 72 OF 80
Fault feed-through signal pigtailsEach fault signal crosses the lower rail through one dedicated feed-through terminal.EI06A / TOWER INTERIORFault feed-through signal pigtailsEach fault signal crosses the lower rail through one dedicated feed-through terminal.Inside tower cabinet · lower fault wire ductTower input collectorLower fault signalsX1, lower rowleft position 4Fault pair 1,signal terminalX1 (function)X1 (function)X2, lower rowleft position 3Fault pair 2,signal terminalX2 (function)X2 (function)X3, lower rowleft position 2Fault pair 3,signal terminalX3 (function)X3 (function)X4, lower rowleft position 1Fault pair 4,signal terminalX4 (function)X4 (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Read the stripFrom the left, the inputs read X4 to X1.The lower rail pairs read X1 to X4.2Trace one signalMatch each X to its own fault-pair signal.Use EI06B for the four associated returns.3Prove each inputTest open and closed using the dry side.Check the App shows the recorded tower.BENCH TESTX1 passed on isolated USB. Address 2 and 9600 baud were checked after a separate power cycle.FIELD CHECKVerify X1–X4 and actual tower names on the assembled radio path. Check fresh position B during the test.Assembly drawing, pp. 12, 16. Isolated X1 test and USB setting-retention records, 12 Nov 2026.CABLE INDEXEN / 73 OF 80
Fault feed-through return pigtailsEach lower rail fault pair has its own return pigtail to the local 0 V block.EI06B / TOWER INTERIORFault feed-through return pigtailsEach lower rail fault pair has its own return pigtail to the local 0 V block.Inside tower cabinet · lower fault wire ductTower fault return blockLower fault returnsFault returnblock, position2Fault pair 1, 0 VterminalX1 return (function)X1 return (function)Fault returnblock, position3Fault pair 2, 0 VterminalX2 return (function)X2 return (function)Fault returnblock, position4Fault pair 3, 0 VterminalX3 return (function)X3 return (function)Fault returnblock, position5Fault pair 4, 0 VterminalX4 return (function)X4 return (function)Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Find the matching pairsIdentify the 0 V terminal of each fault pair.Trace its dedicated slot in the return block.2Trace only the returnUse positions 2 to 5 for fault pairs 1 to 4.Position 1 receives the 0 V supply jumper.3Prove isolationCheck continuity to local 0 V with power off.Verify the powered machine side is isolated.BENCH TESTThe assembly drawing specifies all four return pigtails. The standalone X1 test did not prove the full harness.FIELD CHECKVerify each actual conductor and its source identification before operating the tower.Assembly drawing, pp. 12, 14, 16. Isolated X1 input test record.CABLE INDEXEN / 74 OF 80
Optional tower isolation contact pigtailsUse this dry-contact routing if the isolation relays are within the end-tower assembly.EI07 / TOWER INTERIOROptional tower isolation contact pigtailsUse this dry-contact routing if the isolation relays are within the end-tower assembly.Inside tower cabinet · isolated contact sideTower isolation relay bankLower fault feed-throughsRelayK1contact11Faultpair 1,signalterminalE02-K1-11E02-K1-11RelayK1contact14Faultpair 1, 0V returnE02-K1-14E02-K1-14RelayK2contact11Faultpair 2,signalterminalE02-K2-11E02-K2-11RelayK2contact14Faultpair 2, 0V returnE02-K2-14E02-K2-14RelayK3contact11Faultpair 3,signalterminalE02-K3-11E02-K3-11RelayK3contact14Faultpair 3, 0V returnE02-K3-14E02-K3-14RelayK4contact11Faultpair 4,signalterminalE02-K4-11E02-K4-11RelayK4contact14Faultpair 4, 0V returnE02-K4-14E02-K4-14Terminals are arranged for tracing. Follow the markings on the fitted components.Solid line · documented wiring routeDashed line + open end · confirm on siteColors distinguish routes. Use the printed core IDs.1Locate the relay bankConfirm where the relays are actually mounted.Use E02 for an external isolation enclosure.2Trace the dry sideRoute each 11 to its paired fault signal.Route each 14 to that pair’s local 0 V.3Verify the separationKeep the powered circuit on A1/A2.Check the four dry paths after assembly.BENCH TESTR03 defines the dry-side tags. The standalone X1 check did not verify the optional relay paths.FIELD CHECKConfirm approved relay placement, input mapping and the function of each original-machine circuit.R03, p. 5, E02 dry contacts. Assembly drawing, pp. 14, 16.CABLE INDEXEN / 75 OF 80
Commission travel, stop and local controlRecord the request, the independent feedback and what the installer actually observed.COM-1 / COMMISSIONING & RECORDSCommission travel, stop and local controlRecord the request, the independent feedback and what the installer actually observed.1Check original controlsWith the approved test method, prove local start, local stop, emergencystop, limits and forward/reverse interlocks. Record the local selector positionand independent mode indication.2Prove inputs before motionUse an isolated fixture or approved test contact. Change one input at a time,check its expected return and show it releases. Remove temporary jumpersand restore the field routing.3Witness forward travelSelect the identified machine. Request forward and start. Observe actualmovement, DI1 run and DI2 forward together. Check reverse indicationremains inactive. Record time and direction.4Stop and confirm standstillIssue stop. Record output release, returned run and direction inputs,physical standstill and stopping distance or angle. Confirm the site is clearbefore requesting the opposite direction.5Witness reverse travelRequest reverse then start under the approved trial. Verify physicaldirection, DI1 run and DI3 reverse. Stop and confirm both feedbacksrelease. Exercise local takeover per the signed plan.6Record loss and recoveryUse the approved plan for missing feedback, contradictory inputs or loss ofcommunications. Record the fault, local authority and recovery. Verify themachine stays in the expected state after reconnection.Main cable schedule R02, factory and field tests / Board and jumper-harness acceptance, 13 Nov 2026CABLE INDEXEN / 76 OF 80
Commission water, data and fitted optionsPerform each test against the installed device and its assigned channel.COM-2 / COMMISSIONING & RECORDSCommission water, data and fitted optionsPerform each test against the installed device and its assigned channel.1Span water and end gunOperate each fitted circuit separately. Read its independent return andobserve the actual valve, pump or spray. Check the shutdown state. Recordwhere the indication comes from.2Tower faultsTrigger each approved test point separately, then reset it. Match the physicaltower to the correct X input and App record. Check that other inputs holdtheir state and position B remains fresh.3Cellular link and radioRecord the fitted gateway, local carrier, working network and antenna ports.Verify the center-to-tower radio separately. Interrupt and restore each linkusing the approved test plan.4Center and tower positionCheck the fixed center and a fresh tower fix with timestamps. During a towerinterruption, verify that the previous B position is shown as last known. Verifyrecovery on fresh data.5Speed and sensorsFor an assigned speed output, verify timing and actual travel. For each fittedsensor verify supply, connector, bus address, scaling, timestamps and theobserved reading. Protect unused cores.6Cable monitorCompare the protected conductor, power state, telemetry and notification.Witness the approved loss-of-power and conductor-fault tests separately.Record backup runtime when fitted.Cable schedule R02 / Assembly drawings, pp. 9–17 / Cable label schedule R03CABLE INDEXEN / 77 OF 80
As-built cable and core recordPrint a copy for each physical cable segment. Enter the terminal actually used at each end.RECORD / COMMISSIONING & RECORDSAs-built cable and core recordPrint a copy for each physical cable segment. Enter the terminal actually used at each end.Site / machineCable / segment / lengthDrawing / revisionCore IDEnd A · location / terminalEnd B · location / terminalTest / resultDate / initialsCable type / circuit voltage / bonding arrangementOpen conductors, individually insulated spares or additional witness notesSite record / Attach traced drawing, measured values and installation photos.CABLE INDEXEN / 78 OF 80
Acceptance and handoverComplete this page with the electrician, site witness and owner.HANDOVER / COMMISSIONING & RECORDSAcceptance and handoverComplete this page with the electrician, site witness and owner.Electrical installationAttach the signed drawings, cable lengths, landed terminals, protectivebonding and enclosure checks. Record which conductors or optionsremain parked.Observed operationAttach the travel, stop, local takeover and fault records. Include water,tower or option evidence only for the installed configuration.Operator handoverIdentify the machine in the App. Show normal stop, local control, staleposition and returned feedback. Record who witnessed each action.Open itemsIdentify the specific circuit, unconfirmed endpoint, responsible person andtest still due. Attach the updated as-built record before releasing thatfunction.Electrical installerSignature / dateSite witnessSignature / dateOwner / operatorSignature / dateUse with the machine-specific terminal schedule and commissioning records.CABLE INDEXEN / 79 OF 80
What the project records establishUse the circuit-specific bench and field notes at the foot of every wiring sheet.EVIDENCE / COMMISSIONING & RECORDSWhat the project records establishUse the circuit-specific bench and field notes at the foot of every wiring sheet.1Cabinet assembly drawingsThe 17-page assembly guide identifies the two enclosures, internal supplydistribution, command and input rails, data cables, roof feeders and theseparate prototype cable-monitor components.2R02 terminal scheduleThe main cabinet core schedule and its test sheet identify controller and raildesignations. Original cabinet references lead the electrician to a circuit totrace. Final field landings require the site drawing.3R03 jacket and core labelsThe five-page cable guide and print schedule cover the eleven main outlets,two tower outlets, five antenna feeders, optional spares and themachine-side and controller-side relay cable variants.4Control board and contact harnessOn 13 Nov 2026 the existing harness returned run, forward, reverse andend-gun inputs. Final stop cleared the observed inputs and outputs. Verifythe field motor, new wiring and water circuits separately.5Tower and positioning testsThe isolated tower module registered X1 changing state on 12 Nov. Address2 at 9600 baud was separately read back after a power cycle. Confirm allfour installed tower alarms over radio and fresh position B.6Optional timer and cable monitorThe standard timer sequence has a recorded software case. Its physicaloutput and the original timer changeover await approval. Originalconductors, residual-voltage checks and any monitor backup supply requiresite evidence.Assembly drawing / Original machine schematics / R02 and R03 / Nov 2026 project test recordsCABLE INDEXEN / 80 OF 80