Product & Operator Guide
Step-by-step workflows with full App and administration screens.
Center pivot retrofit
Download the English operator and administration manual or the field wiring and commissioning guide. Follow each task from the first screen to its expected result.
Compare the selected machine, the latest report and its last known location.
Set the date range and distinguish recorded GPS data from physical observations.
Follow the direction selection, confirmation, independent run feedback and stop feedback.
Check permissions, transfer control and investigate missing or unavailable feedback.
Review supported circuits and the separate command and feedback for each.
Set direction, target settings and boundaries, preview the itinerary and save the plan.
Compare the saved version with the equipment report before requesting execution.
Use an issued code and verify the reading, timestamp and source.
Choose the dates, export records and distinguish file imports from live readings.
Find the affected segment and check, acknowledge or resolve the alert.
Check the available live view or playback link and its access requirements.
Check entitlement, recorded readings, trends, sources and missing data.
Review the ownership preview and choose the correct machine after confirmation.
Find the same operation by machine, event and time, and locate language settings.
Open the relevant machine, claim or alert from the status summary.
Review the machine type, position sources and connected tower information.
Compare authorized operations, reported feedback and the saved and applied plans.
Issue or rotate a code, then check its state and the resulting assignment.
Register a supported profile, issue an activation code and review readings or exports.
Configure segments, view heartbeats and manage alerts or authorized read-only access.
Maintain an assigned camera record and review its connection and permissions.
Find the entitlement and verify the account associated with it.
Compare viewer, alert and device permissions and verify changes per machine.
Review account, permissions or configuration changes and find equipment operation records.
Gather the original panel documentation, confirm compatible controls and feedback with the site electrician, and record the installed machine’s signal and mechanical states.
Identify the proposed connections, network conditions and original local controls.
Find cable sizes, both-end labels, terminal diagrams and field checks. Browse the cable index.
See what the recorded controller test covered and what to verify in the field.
Step-by-step workflows with full App and administration screens.
Main and end-tower cable diagrams, conductor labels, terminal checks and site commissioning records.