Sizing a Staging Bay for the STTBOT-T1 at a Proposed Osaka Site

Use the supplied STTBOT-T1 and an adjustable mock-up to specify the clear opening and setup footprint for a proposed Osaka staging bay. Keep the dimensions provisional until repeated handling trials demonstrate the agreed clearances.

Sizing a Staging Bay for the STTBOT-T1 at a Proposed Osaka Site

Summary

Use the supplied STTBOT-T1 and an adjustable mock-up to specify the clear opening and setup footprint for a proposed Osaka staging bay. The SkyHub manual gives folded and standing reference dimensions. Keep the final opening width, height and bay footprint provisional until repeated trials with the planned crew and any handling equipment demonstrate the agreed clearances through entry, positioning, setup and withdrawal.

Key Takeaways

  • Verify the supplied T1 configuration and measure its folded and standing outside dimensions before setting the mock-up.
  • Survey the approach and measure the opening at its narrowest and lowest usable points, including door hardware and the threshold.
  • Reproduce the planned entry orientation, any turn, positioning, standing setup and withdrawal with the planned crew and any handling equipment.
  • Record minimum gaps separately for the robot, staff and equipment, and locate every unintended contact by stage and surface.
  • Adjust the mock-up where a clearance falls below the agreed margin, then repeat the full sequence at the revised dimensions.
  • Put the demonstrated clear opening, setup space and tested configuration on the procurement drawing and verify them at handover.

Proposed Problem

The buyer needs to decide whether the proposed opening and bay layout can accommodate the supplied STTBOT-T1 from arrival through setup and withdrawal. The available evidence gives product reference dimensions and leaves the Osaka opening, bay geometry and handling clearances to be measured. Evaluate the doorway passage, any turn, the change in posture and the crew's exit as stages of the same handling sequence.

For the proposed trial, measure unobstructed width and height with the door in the position agreed for handling. Measure from the finished floor or threshold to the lowest obstruction on the path, and between the closest projections across it. On the bay plan, mark the route, any turning area, the setup position and the space needed by the crew and any handling equipment. If the planned sequence uses a carrier, trace its path from the approach through unloading and withdrawal. Check for the smallest gaps along the entire route and during setup.

Source-Backed Product Boundary

The English SkyHub Air–Ground Product Manual, Revision 1.3, dated 27 September 2026, identifies the STT 1S MAX UAV, the independent STT-HUB1101 aircraft battery-exchange hangar, and the STTBOT-S1 and STTBOT-T1 bipedal ground robots. The proposed staging bay is for the T1. The STT-HUB1101 has four battery storage bays for the aircraft system, and its sliding roof clears the aircraft landing aperture. Rev. 1.3, p. 1, product family, p. 24, STT-HUB1101 configuration, p. 27, hangar zones, p. 57, bipedal ground robots

Page 58 lists the STTBOT-T1 at 1320 mm standing height, 450 × 200 mm standing width × depth, and 690 × 450 × 300 mm folded. Its mass is approximately 35 kg including the battery. Keep the folded dimensions in the order listed and verify which axis is vertical and which crosses the doorway in the supplier-approved handling orientation. Measure the outside envelope with the actual fitted configuration. The STTBOT-S1 is a distinct model. Its outside width and depth come from the delivered-unit configuration record, and its 130 mm figure refers to internal shoulder-frame spacing. Rev. 1.3, p. 58, STTBOT-S1 and STTBOT-T1 comparison, p. 59, supplied-unit envelope and tooling notes

Page 57 states that each robot can return to its own 200 W wireless charging position. Page 58 lists dock alignment, a foreign-object check and battery management system permission as conditions for automatic return for energy. It also lists a 200 W contactless module for the STTBOT-T1 and specifies that robots stay outside the aircraft's landing and rotor exclusion zone while the cabinet receives or releases the UAV. Rev. 1.3, p. 57, STTBOT family, p. 58, charging and aircraft separation

If the proposal puts the T1 charging position in the bay, mark it on the mock-up plan and check access during setup and withdrawal. If the proposal includes the aircraft system, show the T1 route and staging area relative to the aircraft exclusion zone.

Explore the product family on the SkyHub product page.

SkyHub Air-Ground System - functional anatomy

Proposed Design

Start with the actual unit and a dimensioned survey. Record the serial number, battery configuration, any fitted end effector and any carried tool or transport fixture used in the trial. Measure the outside length, width and height with the robot folded and standing, recording the posture and axis for each reading. If the approved handling method uses a carrier, measure the loaded envelope, including projections from the carrier or restraints. Note where handlers need to grip, steer or stand. Check for the closest approach of the robot, staff and equipment at each stage.

Build an adjustable mock-up with independently movable jambs and head, a representative threshold, and marked bay boundaries. Reproduce the approach angle, door hardware, nearby wall returns and any fixed equipment that could restrict movement. Set the mock-up to the surveyed dimensions or, for unbuilt space, to the dimensions on the proposal drawing. Verify the settings before the trial. Mark which side represents each wall so a contact can be traced to a drawing detail.

Use the supplier-approved handling sequence. Bring the robot to the opening in the selected orientation, cross the threshold, turn if required, and move to the setup position. Carry out the approved transition to standing in the intended location, with handlers in their designated places. Then withdraw any equipment and rehearse removing the robot. Use reference marks and observe from outside the area swept by the moving robot, crew and equipment. At each tight point, record the smallest lateral and overhead gaps and any floor or threshold interference. Document any pause or repositioning along with the closest object and the stage of the sequence.

Record intended interactions, such as a carrier rolling on the floor, as well as any unintended contacts with doors, walls or fixtures. For each unintended contact, identify the two surfaces, the location and the movement immediately before contact. If a handler contacts a wall during a turn, adjust the relevant bay boundary or have the supplier approve a change to the handling method before rerunning the sequence. Use a representative apparatus, written procedure and repeatable scoring approach, drawing on NIST's ground robot test methodology for context. NIST Ground Robot Tests

SkyHub Air-Ground System - system operations maintenance

Hypothetical Evaluation Assumptions

Hypothetical evaluation assumption: Run three complete handling sequences for each candidate layout.

Hypothetical evaluation assumption: Hold the documented entry orientation, crew roles, setup steps and withdrawal method constant across runs for each candidate layout.

Hypothetical evaluation assumption: Set a threshold of zero unintended contacts between the robot, staff or handling equipment and fixed opening or bay features during each complete sequence.

Hypothetical evaluation assumption: Score each assessed clearance using its lowest recorded gap across the runs.

Hypothetical evaluation assumption: Use separate minimum clearance margins for the robot, staff and any handling equipment, agreed by the buyer and supplier before scoring.

Agree the margins after reviewing the approved handling method, measurement uncertainty and expected variation in the finished opening and bay. Select dimensions that preserve the demonstrated clearances after accounting for documented installation tolerances. Keep the individual readings so the buyer can trace the smallest gap to the run and stage where it occurred.

Survey and Acceptance Checklist

  • Survey the route. Record usable width and height along the approach, at the opening and in the bay. Locate jambs, stops, handles, overhead projections, thresholds and fixtures. Note floor transitions and usable turning space on both sides of the opening.
  • Identify the test unit. Record the model and serial number, installed battery, any fitted end effector, folded and standing measurements, entry orientation, handling equipment and crew roles. Link photographs and sketches to the corresponding dimensions.
  • Record each run. Capture the stage, robot posture, nearest surface, minimum measured gap for each relevant moving element, points of contact, stops and departures from the script. Keep unsuccessful runs in the trial record.
  • Check setup and exit. Witness the standing transition, staff access to the setup positions, and withdrawal of crew and equipment. Rehearse robot removal using the approved sequence, including any change in orientation on the return path.
  • Release the layout. Have the buyer and supplier review the final trial against the agreed criteria. Mark the clear opening, setup footprint and areas to keep clear on the drawing. Check those dimensions against the finished installation and repeat the checks affected by changes to the path or setup.

Limitations

A mock-up result applies to the tested unit configuration, door position, handling method and setup sequence. A changed carrier, fitted end effector, threshold or door detail can change the smallest clearance. Link each trial to the robot's asset identity and configuration. Page 77 lists the model, serial number, battery ID and capacity, end effector, dock ID, and software and motion-profile revision as asset identity fields for the STTBOT-S1 and STTBOT-T1. Rev. 1.3, p. 77, operating and maintenance records

For the proposed Osaka bay, use the STTBOT-T1 dimensions in Rev. 1.3 page 58 as product references and derive the site clearances from measurements of the supplied unit and mock-up trials. Rev. 1.3, p. 58, STTBOT-T1 dimensions

NIST's ground robot material describes repeatable test apparatus, procedures and metrics. Its aerial FAQ describes methods for assessing small unmanned aircraft systems and remote pilot proficiency. NIST Ground Robot Tests, NIST aerial drone testing FAQ

Procurement Questions

Ask the supplier for the delivered-unit configuration record and an approved sequence covering entry orientation, any handling equipment, staff positions, standing setup and withdrawal. Ask which fixtures, fitted parts or tools are present at each stage and who can authorize a change to the sequence. Confirm whether the charging position is part of the proposed bay and what access the mock-up needs to represent if it is.

Ask the buyer and supplier to agree who measures the clear opening and moving gaps, who witnesses the trials, and who signs off on the plan. Link each run to the tested layout revision and robot identity. Agree which checks to repeat if the supplied configuration or finished construction differs from the accepted drawing.

FAQ

What clear opening should the Osaka proposal specify?

Specify the minimum finished unobstructed width and height supported by the mock-up trials with the supplied T1, the planned crew and any handling equipment. Account for installation tolerances on the procurement drawing so the finished opening preserves the demonstrated clearances.

What are the T1 reference dimensions?

Rev. 1.3 page 58 lists 690 × 450 × 300 mm folded, 1320 mm standing height and 450 × 200 mm standing width × depth. Measure the supplied unit in both postures.

Can the folded dimensions determine doorway width and height?

The folded figures are starting references. Determine the doorway dimensions from the approved orientation, the loaded handling envelope, staff positions and the trial clearances.

What needs space inside the bay?

Allow space for positioning, any turn, the approved standing transition, staff access and withdrawal of any handling equipment. Include the assigned charging position if the proposal places it in the bay.

How should minimum clearances be recorded?

Record the lowest measured gap for the robot, staff and any handling equipment separately, identifying the run, handling stage, robot posture and nearby surface.

What should happen if there is unintended contact with the mock-up?

Record the stage, location and surfaces involved, identify the constraint, revise the layout or have the supplier approve a change to the handling method, and repeat the full sequence.

Can S1 dimensions be inferred from the T1?

Use the S1 supplied-unit configuration record for its outside dimensions. The S1 is a distinct model, and its 130 mm shoulder-frame spacing is an internal dimension.

What should trigger a repeat fit test?

Repeat the affected checks when a change to the supplied configuration, handling method or finished construction alters the tested path or setup.

References

Proposed Equipment

  • STTBOT-T1 bipedal ground robot
  • Adjustable doorway and bay mock-up with a representative threshold
  • Dimensional measuring tools and reference marks
  • Supplier-approved carrier and restraints, if used in the planned handling sequence
  • STTBOT-T1 200 W contactless wireless charging module, if the proposal places the charging position in the bay

Cite This Article

APA

SOLARTODO Editorial Team. (2026). Sizing a Staging Bay for the STTBOT-T1 at a Proposed Osaka Site. SOLARTODO. Retrieved from https://solartodo.com/solutions/osaka-skyhub-5444a73120ac22cc

BibTeX
@article{solartodo_osaka_skyhub_5444a73120ac22cc,
  title = {Sizing a Staging Bay for the STTBOT-T1 at a Proposed Osaka Site},
  author = {SOLARTODO Editorial Team},
  journal = {SOLARTODO Knowledge Base},
  year = {2026},
  url = {https://solartodo.com/solutions/osaka-skyhub-5444a73120ac22cc},
  note = {Accessed: 2026-11-26}
}

Published: November 26, 2026 | Available at: https://solartodo.com/solutions/osaka-skyhub-5444a73120ac22cc